Heidelberg Materials image
unverified-manufacturerManufacturer page.

Heidelberg Materials - EPDs - Offers a comprehensive range of building materials such as cement, aggregates, ready-mixed concrete, and asphalt, known for quality and innovation.

Heidelberg Materials is a leading global manufacturer of building materials, including cement, aggregates, ready-mixed concrete, and asphalt, serving the construction industry worldwide.

Offers a comprehensive range of building materials such as cement, aggregates, ready-mixed concrete, and asphalt, known for quality and innovation.



EPDs (8427)Sorted by date

Material Image

Ready-mix concrete, 41.36854376 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix P2D35428S, Cadman Inc, Redmond plant

Cadman Inc, Redmond plant

321 kg CO2e/m³
Material Image

Ready-mix concrete, 41.36854376 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix P2D35428, Heidelberg Materials, Seattle plant

Heidelberg Materials, Seattle plant

311 kg CO2e/m³
Material Image

Ready-mix concrete, 41.36854376 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix P2D35428, Cadman Inc, Seattle plant

Cadman Inc, Seattle plant

326 kg CO2e/m³
Material Image

Ready-mix concrete, 6000 PSI; Curing time 28d; Cement type: Manufacturer specific, Mix P2D35427, Cadman Materials, Bellevue plant

Cadman Materials, Bellevue plant

318 kg CO2e/m³
Material Image

Ready-mix concrete, 41.36854376 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix P2D35426S, Cadman Inc, Woodinville plant

Cadman Inc, Woodinville plant

321 kg CO2e/m³
Material Image

Ready-mix concrete, 41.36854376 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix P2D35426S, Cadman Inc, Seattle plant

Cadman Inc, Seattle plant

328 kg CO2e/m³
Material Image

Ready-mix concrete, 41.36854376 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix P2D35426S, Cadman Inc, Bellevue plant

Cadman Inc, Bellevue plant

318 kg CO2e/m³
Material Image

Ready-mix concrete, 41.36854376 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix P2D35426, Heidelberg Materials, Seattle plant

Heidelberg Materials, Seattle plant

311 kg CO2e/m³
Material Image

Ready-mix concrete, 41.36854376 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix P2D35426, Heidelberg Materials, Issaquah plant

Heidelberg Materials, Issaquah plant

312 kg CO2e/m³
Material Image

Ready-mix concrete, 41.36854376 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix P2D35426, Cadman Inc, Woodinville plant

Cadman Inc, Woodinville plant

319 kg CO2e/m³
Material Image

Ready-mix concrete, 41.36854376 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix P2D35426, Cadman Inc, Redmond plant

Cadman Inc, Redmond plant

321 kg CO2e/m³
Material Image

Ready-mix concrete, 6000 PSI; Curing time 28d; Cement type: Manufacturer specific, Mix P2D34448S, Cadman Materials, Woodinville plant

Cadman Materials, Woodinville plant

286 kg CO2e/m³
Material Image

Ready-mix concrete, 6000 PSI; Curing time 28d; Cement type: Manufacturer specific, Mix P2D34448S, Cadman Materials, Issaquah plant

Cadman Materials, Issaquah plant

312 kg CO2e/m³
Material Image

Ready-mix concrete, 6000 PSI; Curing time 28d; Cement type: Manufacturer specific, Mix P2D34448S, Cadman Materials, Bellevue plant

Cadman Materials, Bellevue plant

287 kg CO2e/m³
Material Image

Ready-mix concrete, 41.36854376 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix P2D34448S, Cadman Inc, Redmond plant

Cadman Inc, Redmond plant

292 kg CO2e/m³
Material Image

Ready-mix concrete, 58.60543699 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix P2D34448, Cadman Inc, Sky River plant

Cadman Inc, Sky River plant

281 kg CO2e/m³
Material Image

Ready-mix concrete, 58.60543699 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix P2D34448, Cadman Inc, Redmond plant

Cadman Inc, Redmond plant

289 kg CO2e/m³
Material Image

Ready-mix concrete, 58.60543699 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix P2D34448, Cadman Inc, Everett - Smith Island plant

Cadman Inc, Everett - Smith Island plant

274 kg CO2e/m³
Material Image

Ready-mix concrete, 58.60543699 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix P2D34448, Cadman Inc, Bellevue plant

Cadman Inc, Bellevue plant

285 kg CO2e/m³
Material Image

Ready-mix concrete, 48.3 MPa; Curing time 28d, Mix P2701A2, Corliss, Sumner plant

Corliss, Sumner plant

324 kg CO2e/m³
Material Image

Ready-mix concrete, 2500 psi; Curing time 28d; Cement type: Manufacturer specific, Mix P25MG729, Cadman, Redmond plant

Cadman, Redmond plant

295 kg CO2e/m³
Material Image

Ready-mix concrete, 2500 PSI; Curing time 28d; Cement type: Manufacturer specific, Mix P25MG729, Cadman Materials, Seattle plant

Cadman Materials, Seattle plant

289 kg CO2e/m³
Material Image

Ready-mix concrete, 2500 PSI; Curing time 28d; Cement type: Manufacturer specific, Mix P25MG729, Cadman Materials, Redmond plant

Cadman Materials, Redmond plant

295 kg CO2e/m³
Material Image

Ready-mix concrete, 5000 psi; Curing time 28 days; Cement type: Manufacturer specific, Mix P24510, Corliss Resources Inc., Sumner plant

Corliss Resources Inc., Sumner plant

285 kg CO2e/m³
Material Image

Ready-mix concrete, 5000 psi; Curing time 28 days; Cement type: Manufacturer specific, Mix P24510, Corliss Resources Inc., Federal Way plant

Corliss Resources Inc., Federal Way plant

291 kg CO2e/m³
Material Image

Ready-mix concrete, 4000 psi; Curing time 28 days; Cement type: Manufacturer specific, Mix P2401A, Corliss Resources Inc., Federal Way plant

Corliss Resources Inc., Federal Way plant

274 kg CO2e/m³
Material Image

Ready-mix concrete, 3000 psi; Curing time 28 days; Cement type: Manufacturer specific, Mix P2301A, Corliss Resources Inc., Sumner plant

Corliss Resources Inc., Sumner plant

225 kg CO2e/m³
Material Image

Ready-mix concrete, 3000 psi; Curing time 28 days; Cement type: Manufacturer specific, Mix P23010, Corliss Resources Inc., Sumner plant

Corliss Resources Inc., Sumner plant

221 kg CO2e/m³
Material Image

Ready-mix concrete, 10000 psi; Curing time 28d, Mix P210K10, Corliss, Sumner plant

Corliss, Sumner plant

376 kg CO2e/m³
Material Image

Ready-mix concrete, 55.15805835 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix P210K10, Corliss, Federal Way plant

Corliss, Federal Way plant

378 kg CO2e/m³
Material Image

Ready-mix concrete, 55.15805835 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix P1D31438S, Cadman Inc, Seattle plant

Cadman Inc, Seattle plant

361 kg CO2e/m³
Material Image

Ready-mix concrete, 55.15805835 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix P1D31438, Cadman Inc, Seattle plant

Cadman Inc, Seattle plant

357 kg CO2e/m³
Material Image

Ready-mix concrete, 7000 PSI; Curing time 56d; Cement type: Manufacturer specific, Mix P1D28478ZS, Cadman Materials, Seattle plant

Cadman Materials, Seattle plant

320 kg CO2e/m³
Material Image

Ready-mix concrete, 41.36854376 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix P1601A-1, Corliss Resources Inc, Sumner plant

Corliss Resources Inc, Sumner plant

349 kg CO2e/m³
Material Image

Ready-mix concrete, 6000 psi; Curing time 28 days; Cement type: Manufacturer specific, Mix P16010ST, Corliss Resources Inc., Sumner plant

Corliss Resources Inc., Sumner plant

376 kg CO2e/m³
Material Image

Ready-mix concrete, 8000 psi; Curing time 28d, Mix P16010, Corliss, Sumner plant

Corliss, Sumner plant

306 kg CO2e/m³
Material Image

Ready-mix concrete, 41.36854376 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix P16010-1, Corliss Resources Inc, Sumner plant

Corliss Resources Inc, Sumner plant

346 kg CO2e/m³
Material Image

Ready-mix concrete, 4000 psi; Curing time 28 days; Cement type: Manufacturer specific, Mix P14010, Corliss Resources Inc., Sumner plant

Corliss Resources Inc., Sumner plant

236 kg CO2e/m³
Material Image

Ready-mix concrete, 4000 psi; Curing time 28 days; Cement type: Manufacturer specific, Mix P14010, Corliss Resources Inc., Federal Way plant

Corliss Resources Inc., Federal Way plant

243 kg CO2e/m³
Material Image

Ready-mix concrete, 3000 psi; Curing time 28 days; Cement type: Manufacturer specific, Mix P13010, Corliss Resources Inc., Sumner plant

Corliss Resources Inc., Sumner plant

196 kg CO2e/m³
Material Image

Ready-mix concrete, 3000 psi; Curing time 28 days; Cement type: Manufacturer specific, Mix P13010, Corliss Resources Inc., Puyallup plant

Corliss Resources Inc., Puyallup plant

209 kg CO2e/m³
Material Image

Ready-mix concrete, 3000 psi; Curing time 28 days; Cement type: Manufacturer specific, Mix P13010, Corliss Resources Inc., Federal Way plant

Corliss Resources Inc., Federal Way plant

206 kg CO2e/m³
Material Image

Ready-mix concrete, 3000 psi; Curing time 28 days; Cement type: Manufacturer specific, Mix P13010, Corliss Resources Inc., Enumclaw plant

Corliss Resources Inc., Enumclaw plant

205 kg CO2e/m³
Material Image

Ready-mix concrete, 6.894757293 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix P10C26429Z, Cadman Inc, Seattle plant

Cadman Inc, Seattle plant

394 kg CO2e/m³
Material Image

Ready-mix concrete, 41.36854376 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix MCREPELEX6, Cadman Inc, Redmond plant

Cadman Inc, Redmond plant

336 kg CO2e/m³
Material Image

Ready-mix concrete, 100 psi; Curing time 28d; Cement type: Manufacturer specific, Mix MCPFLO5, Cadman, Redmond plant

Cadman, Redmond plant

96.7 kg CO2e/m³
Material Image

Ready-mix concrete, 4000 psi at 56 days, 2400 kg/m3, Mix MC4RCA45425, Cadman Materials Inc, Redmond Plant

Cadman Materials Inc, Redmond Plant

226 kg CO2e/m³
Material Image

Ready-mix concrete, 100 psi at 28 days, 2400 kg/m3, Mix MCPFLO24, Cadman Materials Inc, Redmond Plant

Cadman Materials Inc, Redmond Plant

63.8 kg CO2e/m³
Material Image

Ready-mix concrete, 6000 psi at 28 days, 2400 kg/m3, Mix MC2D37437S, Cadman Materials Inc, Redmond Plant

Cadman Materials Inc, Redmond Plant

298 kg CO2e/m³
Material Image

Ready-mix concrete, 4000 psi at 28 days, 2400 kg/m3, Mix MC4C44436, Cadman Materials Inc, Redmond Plant

Cadman Materials Inc, Redmond Plant

234 kg CO2e/m³
Material Image

Ready-mix concrete, 6000 psi at 28 days, 2400 kg/m3, Mix MC6C36828, Cadman Materials Inc, Redmond Plant (2024)

Cadman Materials Inc, Redmond Plant (2024)

273 kg CO2e/m³
Material Image

Ready-mix concrete, 300 psi at 28 days, 2400 kg/m3, Mix MCPFLO5P, Cadman Materials Inc, Redmond Plant

Cadman Materials Inc, Redmond Plant

102 kg CO2e/m³
Material Image

Ready-mix concrete, 6000 psi at 28 days, 2400 kg/m3, Mix MC2D35426S, Cadman Materials Inc, Redmond Plant

Cadman Materials Inc, Redmond Plant

325 kg CO2e/m³
Material Image

Flowable concrete fill, 1.034213594 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix MCPFLO24P, Cadman Inc, Redmond plant

Cadman Inc, Redmond plant

57.8 kg CO2e/m³
Material Image

Ready-mix concrete, 4000 psi; Curing time 28d; Cement type: Manufacturer specific, Mix MCCL4000, Cadman, Redmond plant

Cadman, Redmond plant

237 kg CO2e/m³
Material Image

Ready-mix concrete, 4000 PSI; Curing time 28d; Cement type: Manufacturer specific, Mix MCCL4000, Cadman Materials, Redmond plant

Cadman Materials, Redmond plant

237 kg CO2e/m³
Material Image

Ready-mix concrete, 9000 PSI; Curing time 28d; Cement type: Manufacturer specific, Mix MC9C26828Z, Cadman Materials, Redmond plant

Cadman Materials, Redmond plant

377 kg CO2e/m³
Material Image

Ready-mix concrete, 8000 PSI; Curing time 56d; Cement type: Manufacturer specific, Mix MC8C33829, Cadman Materials, Redmond plant

Cadman Materials, Redmond plant

289 kg CO2e/m³
Material Image

Ready-mix concrete, 55.15805835 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix MC8C33828, Cadman Inc, Redmond plant

Cadman Inc, Redmond plant

298 kg CO2e/m³
Material Image

Ready-mix concrete, 41.36854376 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix MC6SHO813, Cadman Inc, Redmond plant

Cadman Inc, Redmond plant

360 kg CO2e/m³
Material Image

Ready-mix concrete, 6000 psi; Curing time 28d, Mix MC6RCA41425, Heidelberg Materials, Seattle plant

Heidelberg Materials, Seattle plant

221 kg CO2e/m³
Material Image

Ready-mix concrete, 6000 PSI; Curing time 28d; Cement type: Industry average, Mix MC6C36828, Cadman Materials, Redmond plant

Cadman Materials, Redmond plant

396 kg CO2e/m³
Material Image

Ready-mix concrete, 41.36854376 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix MC6C36426, Cadman Inc, Redmond plant

Cadman Inc, Redmond plant

271 kg CO2e/m³
Material Image

Ready-mix concrete, 41.36854376 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix MC6C33877, Cadman Inc, Redmond plant

Cadman Inc, Redmond plant

297 kg CO2e/m³
Material Image

Ready-mix concrete, 41.36854375901017 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix MC5MFT438, Cadman Inc, Redmond plant

Cadman Inc, Redmond plant

223 kg CO2e/m³
Material Image

Ready-mix concrete, 6000 PSI; Curing time 56d; Cement type: Industry average, Mix MC5C45437, Cadman Materials, Redmond plant

Cadman Materials, Redmond plant

375 kg CO2e/m³
Material Image

Ready-mix concrete, 34.47378647 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix MC5C44848Z, Cadman Inc, Redmond plant

Cadman Inc, Redmond plant

263 kg CO2e/m³
Material Image

Ready-mix concrete, 27.57902917 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix MC5C44838, Cadman Inc, Redmond plant

Cadman Inc, Redmond plant

262 kg CO2e/m³
Material Image

Ready-mix concrete, 34.47378647 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix MC5C44436, Cadman Inc, Redmond plant

Cadman Inc, Redmond plant

261 kg CO2e/m³
Material Image

Ready-mix concrete, 34.47378647 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix MC5C40876, Cadman Inc, Redmond plant

Cadman Inc, Redmond plant

274 kg CO2e/m³
Material Image

Ready-mix concrete, 27.57902917 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix MC4W50414, Cadman Inc, Redmond plant

Cadman Inc, Redmond plant

221 kg CO2e/m³
Material Image

Ready-mix concrete, 4000 psi; Curing time 28d; Cement type: Manufacturer specific, Mix MC4SHO813, Cadman, Redmond plant

Cadman, Redmond plant

369 kg CO2e/m³
Material Image

Ready-mix concrete, 27.57902917 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix MC4RCA45428, Cadman Inc, Redmond plant

Cadman Inc, Redmond plant

227 kg CO2e/m³
Material Image

Ready-mix concrete, 27.57902917 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix MC4PMP856, Cadman Inc, Redmond plant

Cadman Inc, Redmond plant

250 kg CO2e/m³
Material Image

Ready-mix concrete, 4000 PSI; Curing time 28d; Cement type: Manufacturer specific, Mix MC4PMP836, Cadman Materials, Redmond plant

Cadman Materials, Redmond plant

253 kg CO2e/m³
Material Image

Ready-mix concrete, 5000 psi; Curing time 56d, Mix MC4MFT438, Heidelberg Materials, Redmond plant

Heidelberg Materials, Redmond plant

184 kg CO2e/m³
Material Image

Ready-mix concrete, 5000 psi; Curing time 56d, Mix MC4MFT438, Heidelberg Materials, Redmond plant

Heidelberg Materials, Redmond plant

266 kg CO2e/m³
Material Image

Ready-mix concrete, 5000 psi; Curing time 56d; Cement type: Manufacturer specific, Mix MC4MFT438, Cadman, Redmond plant

Cadman, Redmond plant

200 kg CO2e/m³
Material Image

Ready-mix concrete, 5000 PSI; Curing time 56d; Cement type: Industry average, Mix MC4MFT438, Cadman Materials, Redmond plant

Cadman Materials, Redmond plant

283 kg CO2e/m³
Material Image

Ready-mix concrete, 27.57902917 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix MC4C50486, Cadman Inc, Redmond plant

Cadman Inc, Redmond plant

240 kg CO2e/m³
Material Image

Ready-mix concrete, 4000 PSI; Curing time 28d; Cement type: Manufacturer specific, Mix MC4C50436, Cadman Materials, Redmond plant

Cadman Materials, Redmond plant

239 kg CO2e/m³
Material Image

Ready-mix concrete, 27.57902917 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix MC4C44438, Cadman Inc, Redmond plant

Cadman Inc, Redmond plant

235 kg CO2e/m³
Material Image

Ready-mix concrete, 27.57902917 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix MC4000P8, Cadman Inc, Redmond plant

Cadman Inc, Redmond plant

297 kg CO2e/m³
Material Image

Ready-mix concrete, 5000 PSI; Curing time 28d; Cement type: Manufacturer specific, Mix MC3D40428Z, Cadman Materials, Bellevue plant

Cadman Materials, Bellevue plant

272 kg CO2e/m³
Material Image

Ready-mix concrete, 3000 PSI; Curing time 28d; Cement type: Manufacturer specific, Mix MC3C58436, Cadman Materials, Redmond plant

Cadman Materials, Redmond plant

201 kg CO2e/m³
Material Image

Ready-mix concrete, 3000 PSI; Curing time 28d; Cement type: Manufacturer specific, Mix MC3C58414, Cadman Materials, Redmond plant

Cadman Materials, Redmond plant

200 kg CO2e/m³
Material Image

Ready-mix concrete, 3500 psi; Curing time 28d; Cement type: Manufacturer specific, Mix MC3C55486, Cadman, Redmond plant

Cadman, Redmond plant

227 kg CO2e/m³
Material Image

Ready-mix concrete, 24.13165053 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix MC3C55486, Cadman Inc, Redmond plant

Cadman Inc, Redmond plant

227 kg CO2e/m³
Material Image

Ready-mix concrete, 3500 psi; Curing time 28d; Cement type: Manufacturer specific, Mix MC3C55464, Cadman, Redmond plant

Cadman, Redmond plant

227 kg CO2e/m³
Material Image

Ready-mix concrete, 24.13165052608927 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix MC3C55436, Cadman Inc, Redmond plant

Cadman Inc, Redmond plant

228 kg CO2e/m³
Material Image

Ready-mix concrete, 41.36854376 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix MC2D35478S, Cadman Inc, Redmond plant

Cadman Inc, Redmond plant

323 kg CO2e/m³
Material Image

Ready-mix concrete, 41.36854376 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix MC2D35476S, Cadman Inc, Redmond plant

Cadman Inc, Redmond plant

323 kg CO2e/m³
Material Image

Ready-mix concrete, 6000 PSI; Curing time 28d; Cement type: Industry average, Mix MC2D35428S, Cadman Materials, Redmond plant

Cadman Materials, Redmond plant

455 kg CO2e/m³
Material Image

Ready-mix concrete, 41.36854376 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix MC2D34448, Cadman Inc, Redmond plant

Cadman Inc, Redmond plant

290 kg CO2e/m³
Material Image

Ready-mix concrete, 55.15805835 MPa; Curing time 28d; Cement type: Manufacturer/Plant specific, Mix MC1D31438S, Heidelberg Materials, Bellevue plant

Heidelberg Materials, Bellevue plant

375 kg CO2e/m³
Material Image

Ready-mix concrete, 10000 PSI; Curing time 56d; Cement type: Manufacturer specific, Mix MC10C26429ZS, Cadman Materials, Redmond plant

Cadman Materials, Redmond plant

388 kg CO2e/m³
Material Image

Ready-mix concrete, 45 MPa at 56 days; Cement type: Manufacturer specific, Mix LH45E0YB3D11, Lehigh Hanson Materials, Nanaimo plant

Lehigh Hanson Materials, Nanaimo plant

213 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 91 days; Cement type: Manufacturer specific, Mix LH35E0YB7E08, Lehigh Hanson Materials, Victoria plant

Lehigh Hanson Materials, Victoria plant

138 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 91 days; Cement type: Manufacturer specific, Mix LH35E0YB7E08, Lehigh Hanson Materials, Victoria plant

Lehigh Hanson Materials, Victoria plant

138 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa; Curing time 28d, Mix LH35E0YB2D08, Heidelberg Materials Ontario Concrete, Granville Island plant

Heidelberg Materials Ontario Concrete, Granville Island plant

188 kg CO2e/m³