Holcim - EPD - Holcim's major products include cement, ready-mix concrete, and aggregates. The company is known for innovative construction solutions that enhance sustainability and efficiency in building projects.

Holcim is a global leader in building materials and solutions, primarily focused on cement, aggregates, and concrete. It operates in 70 countries and is dedicated to sustainable construction.

Holcim's major products include cement, ready-mix concrete, and aggregates. The company is known for innovative construction solutions that enhance sustainability and efficiency in building projects.


同様の製品を製造する他のメーカー


EPD (8274)日付順に並び替え

Material Image

Ready-mix concrete, 30.23 MPa at 28 days, 64250ID2014, Holcim Mexico, Playa del Carmen plant

Holcim Mexico, Playa del Carmen plant

MX country flagメキシコ
294 kg CO2e/m³
Material Image

Ready-mix concrete, 32.09 MPa at 28 days, 04250ND2014, Holcim Mexico, Playa del Carmen plant

Holcim Mexico, Playa del Carmen plant

MX country flagメキシコ
281 kg CO2e/m³
Material Image

Ready-mix concrete, 19.86 MPa at 28 days, 70200ND2010, Holcim Mexico, Playa del Carmen plant

Holcim Mexico, Playa del Carmen plant

MX country flagメキシコ
240 kg CO2e/m³
Material Image

Ready-mix concrete, 32.59 MPa at 28 days, 70250ND2010, Holcim Mexico, Playa del Carmen plant

Holcim Mexico, Playa del Carmen plant

MX country flagメキシコ
265 kg CO2e/m³
Material Image

Ready-mix concrete, 16.84 MPa at 28 days, 71150ND1014, Holcim Mexico, Playa del Carmen plant

Holcim Mexico, Playa del Carmen plant

MX country flagメキシコ
229 kg CO2e/m³
Material Image

Ready-mix concrete, 24.32 MPa at 28 days, 70250ND2014, Holcim Mexico, Playa del Carmen plant

Holcim Mexico, Playa del Carmen plant

MX country flagメキシコ
272 kg CO2e/m³
Material Image

Ready-mix concrete, 33.88 MPa at 28 days, 04250NB2014, Holcim Mexico, Playa del Carmen plant

Holcim Mexico, Playa del Carmen plant

MX country flagメキシコ
284 kg CO2e/m³
Material Image

Ready-mix concrete, 29.77 MPa at 28 days, 70250NB2014, Holcim Mexico, Playa del Carmen plant

Holcim Mexico, Playa del Carmen plant

MX country flagメキシコ
275 kg CO2e/m³
Material Image

Ready-mix concrete, 20.59 MPa at 28 days, 71150NB1018, Holcim Mexico, Playa del Carmen plant

Holcim Mexico, Playa del Carmen plant

MX country flagメキシコ
234 kg CO2e/m³
Material Image

Ready-mix concrete, 30.73 MPa at 28 days, 70250NB2018, Holcim Mexico, Playa del Carmen plant

Holcim Mexico, Playa del Carmen plant

MX country flagメキシコ
278 kg CO2e/m³
Material Image

Ready-mix concrete, 18.52 MPa at 28 days, 71150NB1014, Holcim Mexico, Playa del Carmen plant

Holcim Mexico, Playa del Carmen plant

MX country flagメキシコ
231 kg CO2e/m³
Material Image

Ready-mix concrete, 30.23 MPa at 28 days, 64250IB2014, Holcim Mexico, Playa del Carmen plant

Holcim Mexico, Playa del Carmen plant

MX country flagメキシコ
297 kg CO2e/m³
Material Image

Ready-mix concrete, 23.58 MPa at 28 days, 70200NB2018, Holcim Mexico, Playa del Carmen plant

Holcim Mexico, Playa del Carmen plant

MX country flagメキシコ
253 kg CO2e/m³
Material Image

Ready-mix concrete, 22.97 MPa at 28 days, 70200NB2014, Holcim Mexico, Playa del Carmen plant

Holcim Mexico, Playa del Carmen plant

MX country flagメキシコ
250 kg CO2e/m³
Material Image

Ready-mix concrete, 30.3 MPa at 28 days, 04250NB2018, Holcim Mexico, Playa del Carmen plant

Holcim Mexico, Playa del Carmen plant

MX country flagメキシコ
288 kg CO2e/m³
Material Image

Ready-mix concrete, 27.3 MPa at 28 days, 70200ND2014, Holcim Mexico, Playa del Carmen plant

Holcim Mexico, Playa del Carmen plant

MX country flagメキシコ
247 kg CO2e/m³
Material Image

Ready-mix concrete, 30.23 MPa at 28 days, 64250IB2018, Holcim Mexico, Playa del Carmen plant

Holcim Mexico, Playa del Carmen plant

MX country flagメキシコ
306 kg CO2e/m³
Material Image

レディミックスコンクリート, 28.92 Mpa、400のkg/m3, 70250NB2018, Holcim México Operaciones, Pesquería Concrete Plant

Holcim México Operaciones, Pesquería Concrete Plant

MX country flagメキシコ
332 kg CO2e/m³
Material Image

レディミックスコンクリート, 27.84 Mpa、400のkg/m3, 70200NB2014, Holcim México Operaciones, Pesquería Concrete Plant

Holcim México Operaciones, Pesquería Concrete Plant

MX country flagメキシコ
285 kg CO2e/m³
Material Image

レディミックスコンクリート, 43.52 Mpa、400のkg/m3, 70350NB2014, Holcim México Operaciones, Pesquería Concrete Plant

Holcim México Operaciones, Pesquería Concrete Plant

MX country flagメキシコ
388 kg CO2e/m³
Material Image

レディミックスコンクリート, 24.64 Mpa、400のkg/m3, 70200ND2010, Holcim México Operaciones, Pesquería Concrete Plant

Holcim México Operaciones, Pesquería Concrete Plant

MX country flagメキシコ
270 kg CO2e/m³
Material Image

レディミックスコンクリート, 26.9 Mpa、400のkg/m3, 70250NB2014, Holcim México Operaciones, Pesquería Concrete Plant

Holcim México Operaciones, Pesquería Concrete Plant

MX country flagメキシコ
333 kg CO2e/m³
Material Image

レディミックスコンクリート, 35.4 Mpa、400のkg/m3, 70350NB2018, Holcim México Operaciones, Pesquería Concrete Plant

Holcim México Operaciones, Pesquería Concrete Plant

MX country flagメキシコ
402 kg CO2e/m³
Material Image

レディミックスコンクリート, 24.68 Mpa、400のkg/m3, 70200ND2008, Holcim México Operaciones, Pesquería Concrete Plant

Holcim México Operaciones, Pesquería Concrete Plant

MX country flagメキシコ
262 kg CO2e/m³
Material Image

レディミックスコンクリート, 32.12 Mpa、400のkg/m3, 70300NB2014, Holcim México Operaciones, Pesquería Concrete Plant

Holcim México Operaciones, Pesquería Concrete Plant

MX country flagメキシコ
367 kg CO2e/m³
Material Image

レディミックスコンクリート, 31.83 Mpa、400のkg/m3, 70300ND2010, Holcim México Operaciones, Pesquería Concrete Plant

Holcim México Operaciones, Pesquería Concrete Plant

MX country flagメキシコ
322 kg CO2e/m³
Material Image

レディミックスコンクリート, 32のMpa、400のkgg/m3, 70250ND2010, Holcim México Operaciones, Pesquería Concrete Plant

Holcim México Operaciones, Pesquería Concrete Plant

MX country flagメキシコ
299 kg CO2e/m³
Material Image

Ready-mix concrete, 2.85 MPa at 28 days, 04250NB2012, Holcim Mexico, Naucalpan plant

Holcim Mexico, Naucalpan plant

MX country flagメキシコ
302 kg CO2e/m³
Material Image

Ready-mix concrete, 3.72 MPa at 28 days, 04350NB2018, Holcim Mexico, Naucalpan plant

Holcim Mexico, Naucalpan plant

MX country flagメキシコ
411 kg CO2e/m³
Material Image

Ready-mix concrete, 3.23 MPa at 28 days, 04300RB2012, Holcim Mexico, Naucalpan plant

Holcim Mexico, Naucalpan plant

MX country flagメキシコ
383 kg CO2e/m³
Material Image

Ready-mix concrete, 3.44 MPa at 28 days, 04300NB2012, Holcim Mexico, Naucalpan plant

Holcim Mexico, Naucalpan plant

MX country flagメキシコ
349 kg CO2e/m³
Material Image

Ready-mix concrete, 3.34 MPa at 28 days, 04300NB2018, Holcim Mexico, Naucalpan plant

Holcim Mexico, Naucalpan plant

MX country flagメキシコ
360 kg CO2e/m³
Material Image

Ready-mix concrete, 3.91 MPa at 28 days, 04350NB2012, Holcim Mexico, Naucalpan plant

Holcim Mexico, Naucalpan plant

MX country flagメキシコ
400 kg CO2e/m³
Material Image

Ready-mix concrete, 23.43 MPa at 28 days, 70200ND2008, Holcim Mexico, Mitras plant

Holcim Mexico, Mitras plant

MX country flagメキシコ
203 kg CO2e/m³
Material Image

Ready-mix concrete, 29.06MPa at 28 days, 70250NB2018, Holcim Mexico, Mitras plant

Holcim Mexico, Mitras plant

MX country flagメキシコ
266 kg CO2e/m³
Material Image

Ready-mix concrete, 42.28 MPa at 28 days, 77045ND4010, Holcim Mexico, Mitras plant

Holcim Mexico, Mitras plant

MX country flagメキシコ
283 kg CO2e/m³
Material Image

Ready-mix concrete, 39.5 MPa at 28 days, 77038ND2010, Holcim Mexico, Mitras plant

Holcim Mexico, Mitras plant

MX country flagメキシコ
255 kg CO2e/m³
Material Image

Ready-mix concrete, 38.09 MPa at 28 days, 70300ND2010, Holcim Mexico, Mitras plant

Holcim Mexico, Mitras plant

MX country flagメキシコ
284 kg CO2e/m³
Material Image

Ready-mix concrete, 24.75 MPa at 28 days, 70200ND2010, Holcim Mexico, Mitras plant

Holcim Mexico, Mitras plant

MX country flagメキシコ
215 kg CO2e/m³
Material Image

Ready-mix concrete, 37.73 MPa at 28 days, 70350NB2014, Holcim Mexico, Mitras plant

Holcim Mexico, Mitras plant

MX country flagメキシコ
301 kg CO2e/m³
Material Image

Ready-mix concrete, 25.99 MPa at 28 days, 70200NB2014, Holcim Mexico, Mitras plant

Holcim Mexico, Mitras plant

MX country flagメキシコ
230 kg CO2e/m³
Material Image

Ready-mix concrete, 27.88MPa at 28 days, 70250ND2010, Holcim Mexico, Mitras plant

Holcim Mexico, Mitras plant

MX country flagメキシコ
242 kg CO2e/m³
Material Image

Ready-mix concrete, 36.3 MPa at 28 days, 71350NB1018, Holcim Mexico, Mitras plant

Holcim Mexico, Mitras plant

MX country flagメキシコ
351 kg CO2e/m³
Material Image

Ready-mix concrete, 31.29MPa at 28 days, 70250NB2014, Holcim Mexico, Mitras plant

Holcim Mexico, Mitras plant

MX country flagメキシコ
260 kg CO2e/m³
Material Image

Ready-mix concrete, 25.64 MPa at 28 days, 60200NB2016, Holcim Mexico, Mitras plant

Holcim Mexico, Mitras plant

MX country flagメキシコ
228 kg CO2e/m³
Material Image

Ready-mix concrete, 42 MPa at 28 days, 70300NB2014, Holcim Mexico, Mitras plant

Holcim Mexico, Mitras plant

MX country flagメキシコ
313 kg CO2e/m³
Material Image

Ready-mix concrete, 41.07 MPa at 28 days, 70350NB2018, Holcim Mexico, Mitras plant

Holcim Mexico, Mitras plant

MX country flagメキシコ
336 kg CO2e/m³
Material Image

レディミックスコンクリート, 2.68 Mpa、400のkg/m3, 04250NB2012, Holcim México Operaciones, Los Reyes Concrete Plant

Holcim México Operaciones, Los Reyes Concrete Plant

MX country flagメキシコ
301 kg CO2e/m³
Material Image

レディミックスコンクリート, 3.61 Mpa、400のkg/m3, 04300NB2018, Holcim México Operaciones, Los Reyes Concrete Plant

Holcim México Operaciones, Los Reyes Concrete Plant

MX country flagメキシコ
361 kg CO2e/m³
Material Image

レディミックスコンクリート, 3.70 Mpa、400のkg/m3, 04300RB2012, Holcim México Operaciones, Los Reyes Concrete Plant

Holcim México Operaciones, Los Reyes Concrete Plant

MX country flagメキシコ
382 kg CO2e/m³
Material Image

レディミックスコンクリート, 3.7 Mpa、400のkg/m3, 04350NB2018, Holcim México Operaciones, Los Reyes Concrete Plant

Holcim México Operaciones, Los Reyes Concrete Plant

MX country flagメキシコ
410 kg CO2e/m³
Material Image

レディミックスコンクリート, 3.91 Mpa、400のkg/m3, 04350NB2012, Holcim México Operaciones, Los Reyes Concrete Plant

Holcim México Operaciones, Los Reyes Concrete Plant

MX country flagメキシコ
400 kg CO2e/m³
Material Image

レディミックスコンクリート, 4.17 Mpa、400のkg/m3, 04300NB2012, Holcim México Operaciones, Los Reyes Concrete Plant

Holcim México Operaciones, Los Reyes Concrete Plant

MX country flagメキシコ
351 kg CO2e/m³
Material Image

Ready-mix concrete, 3.38 MPa at 28 days, 04300NB2018, Holcim Mexico, Iztapalapa plant

Holcim Mexico, Iztapalapa plant

MX country flagメキシコ
354 kg CO2e/m³
Material Image

Ready-mix concrete, 4 MPa at 28 days, 04350NB2012, Holcim Mexico, Iztapalapa plant

Holcim Mexico, Iztapalapa plant

MX country flagメキシコ
411 kg CO2e/m³
Material Image

Ready-mix concrete, 3.79 MPa at 28 days, 04300NB2012, Holcim Mexico, Iztapalapa plant

Holcim Mexico, Iztapalapa plant

MX country flagメキシコ
343 kg CO2e/m³
Material Image

Ready-mix concrete, 2.91 MPa at 28 days, 04250NB2012, Holcim Mexico, Iztapalapa plant

Holcim Mexico, Iztapalapa plant

MX country flagメキシコ
304 kg CO2e/m³
Material Image

Ready-mix concrete, 3.26 MPa at 28 days, 04300RB2012, Holcim Mexico, Iztapalapa plant

Holcim Mexico, Iztapalapa plant

MX country flagメキシコ
396 kg CO2e/m³
Material Image

Ready-mix concrete, 3.8 MPa at 28 days, 04350NB2018, Holcim Mexico, Iztapalapa plant

Holcim Mexico, Iztapalapa plant

MX country flagメキシコ
422 kg CO2e/m³
Material Image

レディミックスコンクリート, 38.54 Mpa、400のkg/m3, 70300ND2010, Holcim México Operaciones, Escobedo Concrete Plant

Holcim México Operaciones, Escobedo Concrete Plant

MX country flagメキシコ
296 kg CO2e/m³
Material Image

レディミックスコンクリート, 23.19 Mpa、400のkg/m3, 70200ND2010, Holcim México Operaciones, Escobedo Concrete Plant

Holcim México Operaciones, Escobedo Concrete Plant

MX country flagメキシコ
225 kg CO2e/m³
Material Image

レディミックスコンクリート, 44.95 Mpa、400のkg/m3, 77045ND4010, Holcim México Operaciones, Escobedo Concrete Plant

Holcim México Operaciones, Escobedo Concrete Plant

MX country flagメキシコ
302 kg CO2e/m³
Material Image

レディミックスコンクリート, 33.05 Mpa、400のkg/m3, 70250NB2018, Holcim México Operaciones, Escobedo Concrete Plant

Holcim México Operaciones, Escobedo Concrete Plant

MX country flagメキシコ
277 kg CO2e/m³
Material Image

レディミックスコンクリート, 36.07 Mpa、400のkg/m3, 70300NB2018, Holcim México Operaciones, Escobedo Concrete Plant

Holcim México Operaciones, Escobedo Concrete Plant

MX country flagメキシコ
293 kg CO2e/m³
Material Image

レディミックスコンクリート, 30.13 Mpa、400のkg/m3, 70250ND2010, Holcim México Operaciones, Escobedo Concrete Plant

Holcim México Operaciones, Escobedo Concrete Plant

MX country flagメキシコ
241 kg CO2e/m³
Material Image

レディミックスコンクリート, 44.95 Mpa、400のkg/m3, 77038ND2010, Holcim México Operaciones, Escobedo Concrete Plant

Holcim México Operaciones, Escobedo Concrete Plant

MX country flagメキシコ
284 kg CO2e/m³
Material Image

レディミックスコンクリート, 29.90 Mpa、400のkg/m3, 70250NB2014, Holcim México Operaciones, Escobedo Concrete Plant

Holcim México Operaciones, Escobedo Concrete Plant

MX country flagメキシコ
254 kg CO2e/m³
Material Image

レディミックスコンクリート, 25.01 Mpa、400のkg/m3, 70200ND2008, Holcim México Operaciones, Escobedo Concrete Plant

Holcim México Operaciones, Escobedo Concrete Plant

MX country flagメキシコ
232 kg CO2e/m³
Material Image

レディミックスコンクリート, 46.00 Mpa、400のkg/m3, 39038ND4012, Holcim México Operaciones, Escobedo Concrete Plant

Holcim México Operaciones, Escobedo Concrete Plant

MX country flagメキシコ
300 kg CO2e/m³
Material Image

レディミックスコンクリート, 44.6 Mpa、400のkg/m3, 70350NB2014, Holcim México Operaciones, Escobedo Concrete Plant

Holcim México Operaciones, Escobedo Concrete Plant

MX country flagメキシコ
304 kg CO2e/m³
Material Image

レディミックスコンクリート, 24.96 Mpa、400のkg/m3, 70200NB2014, Holcim México Operaciones, Escobedo Concrete Plant

Holcim México Operaciones, Escobedo Concrete Plant

MX country flagメキシコ
239 kg CO2e/m³
Material Image

レディミックスコンクリート, 28.69 Mpa、400のkg/m3, 38250ND2012, Holcim México Operaciones, Escobedo Concrete Plant

Holcim México Operaciones, Escobedo Concrete Plant

MX country flagメキシコ
281 kg CO2e/m³
Material Image

レディミックスコンクリート, 44.6 Mpa、400のkg/m3, 70350NB2018, Holcim México Operaciones, Escobedo Concrete Plant

Holcim México Operaciones, Escobedo Concrete Plant

MX country flagメキシコ
337 kg CO2e/m³
Material Image

レディミックスコンクリート, 10.33 Mpa、400のkg/m3, 60100ND4010, Holcim México Operaciones, Escobedo Concrete Plant

Holcim México Operaciones, Escobedo Concrete Plant

MX country flagメキシコ
187 kg CO2e/m³
Material Image

レディミックスコンクリート, 35.98 Mpa、400のkg/m3, 70300NB2014, Holcim México Operaciones, Escobedo Concrete Plant

Holcim México Operaciones, Escobedo Concrete Plant

MX country flagメキシコ
317 kg CO2e/m³
Material Image

レディミックスコンクリート, C30/37、29.4 Mpa (4264.1 psi)、2400のkg/m3, CLASICO 300- Mezcla 2, Holcim México Operaciones, El Salto plant

Holcim México Operaciones, El Salto plant

MX country flagメキシコ
390 kg CO2e/m³
Material Image

レディミックスコンクリート, C30/37、29.4 Mpa (4264.1 psi)、2400のkg/m3, CLASICO 300- Mezcla 3, Holcim México Operaciones, El Salto plant

Holcim México Operaciones, El Salto plant

MX country flagメキシコ
396 kg CO2e/m³
Material Image

レディミックスコンクリート, C30/37、29.4 Mpa (4264.1 psi)、2400のkg/m3, CLASICO 300- Mezcla 1, Holcim México Operaciones, El Salto plant

Holcim México Operaciones, El Salto plant

MX country flagメキシコ
383 kg CO2e/m³
Material Image

レディミックスコンクリート, 20/25、19.6 Mpa (2842.7)、400のkg/m3, FLUIDIUM C. 200- Mezcla 2, Holcim México Operaciones, El Salto plant

Holcim México Operaciones, El Salto plant

MX country flagメキシコ
322 kg CO2e/m³
Material Image

レディミックスコンクリート, C30/37、29.4 Mpa (4264.1 psi)、2400のkg/m3, CLASICO 300- Mezcla 4, Holcim México Operaciones, El Salto plant

Holcim México Operaciones, El Salto plant

MX country flagメキシコ
403 kg CO2e/m³
Material Image

レディミックスコンクリート, C20 / 25, 24.5 Mpa (3553.4 psi), 2400 kg / m3, CLASICO 250- Mezcla 2, Holcim México Operaciones, El Salto plant

Holcim México Operaciones, El Salto plant

MX country flagメキシコ
350 kg CO2e/m³
Material Image

レディミックスコンクリート, 20/25、19.6 Mpa (2842.7)、400のkg/m3, CLASICO 200- Mezcla 4, Holcim México Operaciones, El Salto plant

Holcim México Operaciones, El Salto plant

MX country flagメキシコ
323 kg CO2e/m³
Material Image

レディミックスコンクリート, 4.1 Mpa (594.7 psi)、2400のkg/m3, FLOORTECH 042- Mezcla 2, Holcim México Operaciones, El Salto plant

Holcim México Operaciones, El Salto plant

MX country flagメキシコ
362 kg CO2e/m³
Material Image

レディミックスコンクリート, C20 / 25, 24.5 Mpa (3553.4 psi), 2400 kg / m3, CLASICO 250- Mezcla 4, Holcim México Operaciones, El Salto plant

Holcim México Operaciones, El Salto plant

MX country flagメキシコ
363 kg CO2e/m³
Material Image

レディミックスコンクリート, 4.1 Mpa (594.7 psi)、2400のkg/m3, PAVEX 042- Mezcla 2, Holcim México Operaciones, El Salto plant

Holcim México Operaciones, El Salto plant

MX country flagメキシコ
362 kg CO2e/m³
Material Image

レディミックスコンクリート, 4.1 Mpa (594.7 psi)、2400のkg/m3, PAVEX 042- Mezcla 3, Holcim México Operaciones, El Salto plant

Holcim México Operaciones, El Salto plant

MX country flagメキシコ
368 kg CO2e/m³
Material Image

レディミックスコンクリート, C20 / 25, 24.5 Mpa (3553.4 psi), 2400 kg / m3, CLASICO 250- Mezcla 3, Holcim México Operaciones, El Salto plant

Holcim México Operaciones, El Salto plant

MX country flagメキシコ
355 kg CO2e/m³
Material Image

レディミックスコンクリート, 20/25、19.6 Mpa (2842.7)、400のkg/m3, FLUIDIUM C. 200- Mezcla 1, Holcim México Operaciones, El Salto plant

Holcim México Operaciones, El Salto plant

MX country flagメキシコ
312 kg CO2e/m³
Material Image

レディミックスコンクリート, 20/25、19.6 Mpa (2842.7)、400のkg/m3, CLASICO 200- Mezcla 2, Holcim México Operaciones, El Salto plant

Holcim México Operaciones, El Salto plant

MX country flagメキシコ
310 kg CO2e/m³
Material Image

レディミックスコンクリート, 20/25、19.6 Mpa (2842.7)、400のkg/m3, CLASICO 200- Mezcla 1, Holcim México Operaciones, El Salto plant

Holcim México Operaciones, El Salto plant

MX country flagメキシコ
303 kg CO2e/m³
Material Image

レディミックスコンクリート, 4.1 Mpa (594.7 psi)、2400のkg/m3, PAVEX 042- Mezcla 1, Holcim México Operaciones, El Salto plant

Holcim México Operaciones, El Salto plant

MX country flagメキシコ
351 kg CO2e/m³
Material Image

レディミックスコンクリート, 4.1 Mpa (594.7 psi)、2400のkg/m3, FLOORTECH 042- Mezcla 1, Holcim México Operaciones, El Salto plant

Holcim México Operaciones, El Salto plant

MX country flagメキシコ
355 kg CO2e/m³
Material Image

レディミックスコンクリート, C20 / 25, 24.5 Mpa (3553.4 psi), 2400 kg / m3, CLASICO 250 - Mezcla 1, Holcim México Operaciones, El Salto plant

Holcim México Operaciones, El Salto plant

MX country flagメキシコ
342 kg CO2e/m³
Material Image

レディミックスコンクリート, 20/25、19.6 Mpa (2842.7)、400のkg/m3, CLASICO 200- Mezcla 3, Holcim México Operaciones, El Salto plant

Holcim México Operaciones, El Salto plant

MX country flagメキシコ
316 kg CO2e/m³
Material Image

Ready-mix concrete, 36.82 MPa at 28 days, 70300ND2010, Holcim Mexico, Dulces Nombres plant

Holcim Mexico, Dulces Nombres plant

MX country flagメキシコ
312 kg CO2e/m³
Material Image

Ready-mix concrete, 46.42 MPa at 28 days, 70350RB2018, Holcim Mexico, Dulces Nombres plant

Holcim Mexico, Dulces Nombres plant

MX country flagメキシコ
404 kg CO2e/m³
Material Image

Ready-mix concrete, 11.50 MPa at 28 days, 60100ND4010, Holcim Mexico, Dulces Nombres plant

Holcim Mexico, Dulces Nombres plant

MX country flagメキシコ
201 kg CO2e/m³
Material Image

Ready-mix concrete, 41.04 MPa at 28 days, 70350NB2014, Holcim Mexico, Dulces Nombres plant

Holcim Mexico, Dulces Nombres plant

MX country flagメキシコ
359 kg CO2e/m³
Material Image

Ready-mix concrete, 39.00 MPa at 28 days, 77038ND2010, Holcim Mexico, Dulces Nombres plant

Holcim Mexico, Dulces Nombres plant

MX country flagメキシコ
301 kg CO2e/m³
Material Image

Ready-mix concrete, 30.67 MPa at 28 days, 70250NB2018, Holcim Mexico, Dulces Nombres plant

Holcim Mexico, Dulces Nombres plant

MX country flagメキシコ
291 kg CO2e/m³