Holcim image
unverified-manufacturerManufacturer page.

Holcim - EPDs - Cement, aggregates, ready-mix concrete, and solutions for construction.

Holcim is a global leader in innovative and sustainable building solutions.

Cement, aggregates, ready-mix concrete, and solutions for construction.


Other manufacturers with similar products


EPDs (5181)Sorted by date

Material Image

Ready-mix concrete, 25 MPa; Curing time 56d; Cement type: Manufacturer specific, Mix RMXUG25B5A8M (Lafarge Canada, Port Mann Ready-Mix plant)

Lafarge Canada, Port Mann Ready-Mix plant

142 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa; Curing time 28d; Cement type: Manufacturer specific, Mix RMXGG35A21F (Lafarge Canada, Nisku Ready-Mix plant)

Lafarge Canada, Nisku Ready-Mix plant

324 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa; Curing time 28d; Cement type: Manufacturer specific, Mix RMXGF32A51F (Lafarge Canada, Saskatoon plant)

Lafarge Canada, Saskatoon plant

300 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa; Curing time 56d; Cement type: Manufacturer specific, Mix RMXUG25B5A8M (Lafarge Canada, Clearbrook Ready-Mix plant)

Lafarge Canada, Clearbrook Ready-Mix plant

134 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa; Curing time 28d; Cement type: Industry average, Mix RMXG830A11F (Lafarge Canada, Airdrie Ready-Mix plant)

Lafarge Canada, Airdrie Ready-Mix plant

259 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa; Curing time 3d; Cement type: Industry average, Mix RMXEG32A71F (Lafarge Canada, Northland Oak Bluff plant)

Lafarge Canada, Northland Oak Bluff plant

410 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa; Curing time 28d; Cement type: Manufacturer specific, Mix RMXSY35B61T (Lafarge Canada, Kent Avenue Ready-Mix plant)

Lafarge Canada, Kent Avenue Ready-Mix plant

283 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa; Curing time 28d; Cement type: Industry average, Mix RMXGF35A21F (Lafarge Canada, Perimeter Portage-la-Prairie plant)

Lafarge Canada, Perimeter Portage-la-Prairie plant

345 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa; Curing time 28d; Cement type: Industry average, Mix RMXSF25A51F (Lafarge Canada, Lafarge Dawson Rd plant)

Lafarge Canada, Lafarge Dawson Rd plant

257 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa; Curing time 28d; Cement type: Manufacturer specific, Mix RMXGG25A21F (Lafarge Canada, Saskatoon plant)

Lafarge Canada, Saskatoon plant

268 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa; Curing time 28d; Cement type: Industry average, Mix RMXGG20A21F (Lafarge Canada, Lafarge Dawson Rd plant)

Lafarge Canada, Lafarge Dawson Rd plant

202 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa; Curing time 28d; Cement type: Manufacturer specific, Mix RMXUH25A3A1 (Lafarge Canada, Petroway Ready-Mix plant)

Lafarge Canada, Petroway Ready-Mix plant

306 kg CO2e/m³
Material Image

Ready-mix concrete, 80 MPa; Curing time 56d; Cement type: Industry average, Mix RMXUU80B1A4 (Lafarge Canada, Spy Hill Ready-Mix plant)

Lafarge Canada, Spy Hill Ready-Mix plant

391 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa; Curing time 28d; Cement type: Industry average, Mix RMXQD30A11S (Lafarge Canada, Airdrie Ready-Mix plant)

Lafarge Canada, Airdrie Ready-Mix plant

321 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa; Curing time 28d; Cement type: Manufacturer specific, Mix RMXAGVCFA02 (Lafarge Canada, Regina plant)

Lafarge Canada, Regina plant

304 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa; Curing time 28d; Cement type: Industry average, Mix RMXWV25L21F (Lafarge Canada, Perimeter Steinbach plant)

Lafarge Canada, Perimeter Steinbach plant

247 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa; Curing time 28d; Cement type: Manufacturer specific, Mix RMXGG25C61FE (Lafarge Canada, Lafarge Dawson Rd plant)

Lafarge Canada, Lafarge Dawson Rd plant

217 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa; Curing time 28d; Cement type: Manufacturer specific, Mix RMXGG25A21F (Lafarge Canada, Nisku Ready-Mix plant)

Lafarge Canada, Nisku Ready-Mix plant

295 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa; Curing time 28d; Cement type: Manufacturer specific, Mix RMXGG32A11F (Lafarge Canada, Regina plant)

Lafarge Canada, Regina plant

289 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa; Curing time 28d; Cement type: Industry average, Mix RMXWV25A21FE (Lafarge Canada, Perimeter Steinbach plant)

Lafarge Canada, Perimeter Steinbach plant

243 kg CO2e/m³
Material Image

Ready-mix concrete, 60 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUV60B2A1 (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

325 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG35A6A8M (Lafarge Canada Inc, Port Mann Ready-Mix plant)

Lafarge Canada Inc, Port Mann Ready-Mix plant

176 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Industry average, Mix RMXG832A61P (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

337 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Industry average, Mix RMXSC35A61F (Lafarge Canada Inc, Perimeter Niverville plant)

Lafarge Canada Inc, Perimeter Niverville plant

416 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG35A5A8M (Lafarge Canada Inc, Port Mann Ready-Mix plant)

Lafarge Canada Inc, Port Mann Ready-Mix plant

174 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 56 days; Cement type: Industry average, Mix RMXG835A11FE (Lafarge Canada Inc, Spy Hill Ready-Mix plant)

Lafarge Canada Inc, Spy Hill Ready-Mix plant

254 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 56 days; Cement type: Industry average, Mix RMXG835A61VE (Lafarge Canada Inc, Spy Hill Ready-Mix plant)

Lafarge Canada Inc, Spy Hill Ready-Mix plant

319 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG35A31VP (Lafarge Canada Inc, Clearbrook Ready-Mix plant)

Lafarge Canada Inc, Clearbrook Ready-Mix plant

198 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG30A5F4E (Lafarge Canada Inc, Winterburn Ready-Mix plant)

Lafarge Canada Inc, Winterburn Ready-Mix plant

268 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Industry average, Mix RMXUV25C2A4E (Lafarge Canada Inc, Perimeter Niverville plant)

Lafarge Canada Inc, Perimeter Niverville plant

228 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXHS32A5A1 (Lafarge Canada Inc, Stadium road Ready-Mix plant)

Lafarge Canada Inc, Stadium road Ready-Mix plant

319 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 56 days; Cement type: Industry average, Mix RMXAGA3561C (Lafarge Canada Inc, Spy Hill Ready-Mix plant)

Lafarge Canada Inc, Spy Hill Ready-Mix plant

337 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Industry average, Mix RMX4J32A71F (Lafarge Canada Inc, Perimeter Steinbach plant)

Lafarge Canada Inc, Perimeter Steinbach plant

360 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Industry average, Mix RMX4L32A71P (Lafarge Canada Inc, Perimeter Portage-la-Prairie plant)

Lafarge Canada Inc, Perimeter Portage-la-Prairie plant

429 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Industry average, Mix RMXQD25A51P (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

276 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG32AP6F (Lafarge Canada Inc, Winterburn Ready-Mix plant)

Lafarge Canada Inc, Winterburn Ready-Mix plant

267 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXMG30P31FM (Lafarge Canada Inc, Vancouver Harbour Ready-Mix plant)

Lafarge Canada Inc, Vancouver Harbour Ready-Mix plant

171 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 28 days; Cement type: Industry average, Mix RMXGG20A21F (Lafarge Canada Inc, Perimeter Steinbach plant)

Lafarge Canada Inc, Perimeter Steinbach plant

224 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Industry average, Mix RMXQD30A11S (Lafarge Canada Inc, Airdrie Ready-Mix plant)

Lafarge Canada Inc, Airdrie Ready-Mix plant

321 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG20A21F (Lafarge Canada Inc, Petroway Ready-Mix plant)

Lafarge Canada Inc, Petroway Ready-Mix plant

274 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXMG30P31FM (Lafarge Canada Inc, Surrey Ready-Mix plant)

Lafarge Canada Inc, Surrey Ready-Mix plant

174 kg CO2e/m³
Material Image

Ready-mix concrete, 80 MPa at 56 days; Cement type: Industry average, Mix RMXUU80B1A4 (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

373 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXUD32A61U (Lafarge Canada Inc, Winterburn Ready-Mix plant)

Lafarge Canada Inc, Winterburn Ready-Mix plant

332 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Industry average, Mix RMXQD25A11P (Lafarge Canada Inc, Airdrie Ready-Mix plant)

Lafarge Canada Inc, Airdrie Ready-Mix plant

300 kg CO2e/m³
Material Image

Ready-mix concrete, 60 MPa at 28 days; Cement type: Industry average, Mix RMXGG60A21F (Lafarge Canada Inc, Perimeter Portage-la-Prairie plant)

Lafarge Canada Inc, Perimeter Portage-la-Prairie plant

544 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Industry average, Mix RMXSF30A51F (Lafarge Canada Inc, Lafarge Dawson Rd plant)

Lafarge Canada Inc, Lafarge Dawson Rd plant

247 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Industry average, Mix RMXSC32A61F (Lafarge Canada Inc, Lafarge Dawson Rd plant)

Lafarge Canada Inc, Lafarge Dawson Rd plant

337 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Industry average, Mix RMXQW32A61P (Lafarge Canada Inc, Airdrie Ready-Mix plant)

Lafarge Canada Inc, Airdrie Ready-Mix plant

452 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG25A3A8M (Lafarge Canada Inc, Surrey Ready-Mix plant)

Lafarge Canada Inc, Surrey Ready-Mix plant

134 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 56 days; Cement type: Industry average, Mix RMXGX32A57FE (Lafarge Canada Inc, Lafarge Dawson Rd plant)

Lafarge Canada Inc, Lafarge Dawson Rd plant

269 kg CO2e/m³
Material Image

Ready-mix concrete, 45 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXV745A71T (Lafarge Canada Inc, Nisku Ready-Mix plant)

Lafarge Canada Inc, Nisku Ready-Mix plant

446 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG25A51V (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

194 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Industry average, Mix RMXGF30A21F (Lafarge Canada Inc, Lafarge Dawson Rd plant)

Lafarge Canada Inc, Lafarge Dawson Rd plant

280 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXMG20P31FM (Lafarge Canada Inc, Chilliwack Ready-Mix plant)

Lafarge Canada Inc, Chilliwack Ready-Mix plant

150 kg CO2e/m³
Material Image

Ready-mix concrete, 0 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXJG00R71F (Lafarge Canada Inc, Stadium road Ready-Mix plant)

Lafarge Canada Inc, Stadium road Ready-Mix plant

114 kg CO2e/m³
Material Image

Ready-mix concrete, 50 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXK825A21F (Lafarge Canada Inc, Petroway Ready-Mix plant)

Lafarge Canada Inc, Petroway Ready-Mix plant

465 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXG835A51F (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

290 kg CO2e/m³
Material Image

Ready-mix concrete, 40 MPa at 28 days; Cement type: Industry average, Mix RMXGG40A61F (Lafarge Canada Inc, Northland Oak Bluff plant)

Lafarge Canada Inc, Northland Oak Bluff plant

384 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG25A61F (Lafarge Canada Inc, Nisku Ready-Mix plant)

Lafarge Canada Inc, Nisku Ready-Mix plant

294 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG30A6A8M (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

151 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Industry average, Mix RMXGF25A21F (Lafarge Canada Inc, Perimeter Niverville plant)

Lafarge Canada Inc, Perimeter Niverville plant

280 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Industry average, Mix RMXG832A61P (Lafarge Canada Inc, Airdrie Ready-Mix plant)

Lafarge Canada Inc, Airdrie Ready-Mix plant

368 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXUH20A21U (Lafarge Canada Inc, Petroway Ready-Mix plant)

Lafarge Canada Inc, Petroway Ready-Mix plant

294 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG32A61F (Lafarge Canada Inc, Stadium road Ready-Mix plant)

Lafarge Canada Inc, Stadium road Ready-Mix plant

361 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Industry average, Mix RMX4L32A71P (Lafarge Canada Inc, Lafarge Dawson Rd plant)

Lafarge Canada Inc, Lafarge Dawson Rd plant

399 kg CO2e/m³
Material Image

Ready-mix concrete, 40 MPa at 28 days; Cement type: Industry average, Mix RMXK840A21F (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

310 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXUH25A3A1 (Lafarge Canada Inc, Petroway Ready-Mix plant)

Lafarge Canada Inc, Petroway Ready-Mix plant

306 kg CO2e/m³
Material Image

Ready-mix concrete, 40 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG40A21F (Lafarge Canada Inc, Nisku Ready-Mix plant)

Lafarge Canada Inc, Nisku Ready-Mix plant

365 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXSP32A6SF (Lafarge Canada Inc, Regina plant)

Lafarge Canada Inc, Regina plant

310 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 28 days; Cement type: Industry average, Mix RMXWV20A21FE (Lafarge Canada Inc, Northland Oak Bluff plant)

Lafarge Canada Inc, Northland Oak Bluff plant

198 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG25A61F (Lafarge Canada Inc, Petroway Ready-Mix plant)

Lafarge Canada Inc, Petroway Ready-Mix plant

303 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Industry average, Mix RMXSF30A51F (Lafarge Canada Inc, Perimeter Portage-la-Prairie plant)

Lafarge Canada Inc, Perimeter Portage-la-Prairie plant

277 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 56 days; Cement type: Industry average, Mix RMXUG32A5SE (Lafarge Canada Inc, Spy Hill Ready-Mix plant)

Lafarge Canada Inc, Spy Hill Ready-Mix plant

264 kg CO2e/m³
Material Image

Ready-mix concrete, 60 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXK825A61F (Lafarge Canada Inc, Stadium road Ready-Mix plant)

Lafarge Canada Inc, Stadium road Ready-Mix plant

452 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG25A51VP (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

170 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG25A2F4E (Lafarge Canada Inc, Winterburn Ready-Mix plant)

Lafarge Canada Inc, Winterburn Ready-Mix plant

216 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Industry average, Mix RMXUH32A61U (Lafarge Canada Inc, Perimeter Steinbach plant)

Lafarge Canada Inc, Perimeter Steinbach plant

381 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Industry average, Mix RMXQD35A61P (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

384 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG25A5F5 (Lafarge Canada Inc, Nisku Ready-Mix plant)

Lafarge Canada Inc, Nisku Ready-Mix plant

261 kg CO2e/m³
Material Image

Ready-mix concrete, 60 MPa at 28 days; Cement type: Industry average, Mix RMXGG60A21F (Lafarge Canada Inc, Perimeter Steinbach plant)

Lafarge Canada Inc, Perimeter Steinbach plant

546 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Industry average, Mix RMXGF35A21F (Lafarge Canada Inc, Lafarge Dawson Rd plant)

Lafarge Canada Inc, Lafarge Dawson Rd plant

321 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Industry average, Mix RMXWH32A61VE (Lafarge Canada Inc, Lafarge Dawson Rd plant)

Lafarge Canada Inc, Lafarge Dawson Rd plant

320 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Industry average, Mix RMXSF25A51F (Lafarge Canada Inc, Lafarge Dawson Rd plant)

Lafarge Canada Inc, Lafarge Dawson Rd plant

257 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Industry average, Mix RMXUV25C2A4E (Lafarge Canada Inc, Northland Oak Bluff plant)

Lafarge Canada Inc, Northland Oak Bluff plant

205 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG30A5A8M (Lafarge Canada Inc, North Vancouver Ready-Mix plant)

Lafarge Canada Inc, North Vancouver Ready-Mix plant

152 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG25A61F (Lafarge Canada Inc, Winterburn Ready-Mix plant)

Lafarge Canada Inc, Winterburn Ready-Mix plant

263 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Industry average, Mix RMXSC32A61F (Lafarge Canada Inc, Perimeter Portage-la-Prairie plant)

Lafarge Canada Inc, Perimeter Portage-la-Prairie plant

360 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXUV35B3A1 (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

250 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG20A5SF (Lafarge Canada Inc, Regina plant)

Lafarge Canada Inc, Regina plant

213 kg CO2e/m³
Material Image

Ready-mix concrete, 10 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXUE10P3A4 (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

117 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG30A31V (Lafarge Canada Inc, Clearbrook Ready-Mix plant)

Lafarge Canada Inc, Clearbrook Ready-Mix plant

194 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG30B3A8M (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

147 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXUV25B3A1 (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

203 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Industry average, Mix RMXSF30A51F (Lafarge Canada Inc, Perimeter Steinbach plant)

Lafarge Canada Inc, Perimeter Steinbach plant

276 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG32A5SF (Lafarge Canada Inc, Regina plant)

Lafarge Canada Inc, Regina plant

328 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 56 days; Cement type: Industry average, Mix RMXSS35A55FE (Lafarge Canada Inc, Perimeter Niverville plant)

Lafarge Canada Inc, Perimeter Niverville plant

417 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG35A61VP (Lafarge Canada Inc, Clearbrook Ready-Mix plant)

Lafarge Canada Inc, Clearbrook Ready-Mix plant

211 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG30A61V (Lafarge Canada Inc, Clearbrook Ready-Mix plant)

Lafarge Canada Inc, Clearbrook Ready-Mix plant

209 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG25A5F5 (Lafarge Canada Inc, Winterburn Ready-Mix plant)

Lafarge Canada Inc, Winterburn Ready-Mix plant

227 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXVD30A71U (Lafarge Canada Inc, Stadium road Ready-Mix plant)

Lafarge Canada Inc, Stadium road Ready-Mix plant

370 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG25A51VP (Lafarge Canada Inc, Clearbrook Ready-Mix plant)

Lafarge Canada Inc, Clearbrook Ready-Mix plant

164 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG35B6A8M (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

178 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Industry average, Mix RMXWH32A61V (Lafarge Canada Inc, Northland Oak Bluff plant)

Lafarge Canada Inc, Northland Oak Bluff plant

312 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 1 days; Cement type: Industry average, Mix RMXK925A21F (Lafarge Canada Inc, Lafarge Dawson Rd plant)

Lafarge Canada Inc, Lafarge Dawson Rd plant

500 kg CO2e/m³
Material Image

Ready-mix concrete, 40 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUV40B6A1 (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

283 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG35A3A8M (Lafarge Canada Inc, North Vancouver Ready-Mix plant)

Lafarge Canada Inc, North Vancouver Ready-Mix plant

167 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Industry average, Mix RMXUU35A61F (Lafarge Canada Inc, Spy Hill Ready-Mix plant)

Lafarge Canada Inc, Spy Hill Ready-Mix plant

366 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG35A61VP (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

216 kg CO2e/m³
Material Image

Ready-mix concrete, 60 MPa at 28 days; Cement type: Industry average, Mix RMXGG60A21F (Lafarge Canada Inc, Perimeter Niverville plant)

Lafarge Canada Inc, Perimeter Niverville plant

538 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG30A61V (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

214 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG25B5A8M (Lafarge Canada Inc, Surrey Ready-Mix plant)

Lafarge Canada Inc, Surrey Ready-Mix plant

143 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG20A21F (Lafarge Canada Inc, Winterburn Ready-Mix plant)

Lafarge Canada Inc, Winterburn Ready-Mix plant

231 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 3 days; Cement type: Industry average, Mix RMXEG32A71F (Lafarge Canada Inc, Lafarge Dawson Rd plant)

Lafarge Canada Inc, Lafarge Dawson Rd plant

405 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXLP30R11F (Lafarge Canada Inc, Regina plant)

Lafarge Canada Inc, Regina plant

327 kg CO2e/m³
Material Image

Ready-mix concrete, 60 MPa at 28 days; Cement type: Industry average, Mix RMXGG60A21F (Lafarge Canada Inc, Northland Oak Bluff plant)

Lafarge Canada Inc, Northland Oak Bluff plant

521 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Industry average, Mix RMXWV25L21F (Lafarge Canada Inc, Perimeter Steinbach plant)

Lafarge Canada Inc, Perimeter Steinbach plant

247 kg CO2e/m³
Material Image

Ready-mix concrete, 10 MPa at 28 days; Cement type: Industry average, Mix RMXLC08A61U (Lafarge Canada Inc, Airdrie Ready-Mix plant)

Lafarge Canada Inc, Airdrie Ready-Mix plant

161 kg CO2e/m³
Material Image

Ready-mix concrete, 40 MPa at 28 days; Cement type: Industry average, Mix RMXGG40A61F (Lafarge Canada Inc, Lafarge Dawson Rd plant)

Lafarge Canada Inc, Lafarge Dawson Rd plant

383 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 2 days; Cement type: Manufacturer specific, Mix RMXNH45A61E (Lafarge Canada Inc, Saskatoon plant)

Lafarge Canada Inc, Saskatoon plant

376 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 28 days; Cement type: Industry average, Mix RMXUV20A51FE (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

213 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Industry average, Mix RMXG832A61F (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

322 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG30A31V (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

201 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG25B31V (Lafarge Canada Inc, Clearbrook Ready-Mix plant)

Lafarge Canada Inc, Clearbrook Ready-Mix plant

186 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 56 days; Cement type: Industry average, Mix RMXUV25A51FE (Lafarge Canada Inc, Spy Hill Ready-Mix plant)

Lafarge Canada Inc, Spy Hill Ready-Mix plant

229 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 28 days; Cement type: Industry average, Mix RMXWV20A21FE (Lafarge Canada Inc, Perimeter Niverville plant)

Lafarge Canada Inc, Perimeter Niverville plant

226 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXMG20P31FM (Lafarge Canada Inc, Maple Ridge Ready-Mix plant)

Lafarge Canada Inc, Maple Ridge Ready-Mix plant

148 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG30A21F (Lafarge Canada Inc, Stadium road Ready-Mix plant)

Lafarge Canada Inc, Stadium road Ready-Mix plant

313 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 56 days; Cement type: Industry average, Mix RMXG835A11FE (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

258 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 56 days; Cement type: Industry average, Mix RMXG835A61VE (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

321 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG25B3A8M (Lafarge Canada Inc, Surrey Ready-Mix plant)

Lafarge Canada Inc, Surrey Ready-Mix plant

138 kg CO2e/m³
Material Image

Ready-mix concrete, 24 MPa at 56 days; Cement type: Industry average, Mix RMXGX25A25FE (Lafarge Canada Inc, Northland Oak Bluff plant)

Lafarge Canada Inc, Northland Oak Bluff plant

243 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG32A11F (Lafarge Canada Inc, Regina plant)

Lafarge Canada Inc, Regina plant

289 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Industry average, Mix RMXSF30A51F (Lafarge Canada Inc, Perimeter Niverville plant)

Lafarge Canada Inc, Perimeter Niverville plant

270 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG20A3A8M (Lafarge Canada Inc, Port Mann Ready-Mix plant)

Lafarge Canada Inc, Port Mann Ready-Mix plant

122 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Industry average, Mix RMXQD25A51P (Lafarge Canada Inc, Airdrie Ready-Mix plant)

Lafarge Canada Inc, Airdrie Ready-Mix plant

305 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG20A51F (Lafarge Canada Inc, Winterburn Ready-Mix plant)

Lafarge Canada Inc, Winterburn Ready-Mix plant

230 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG30A21F (Lafarge Canada Inc, Winterburn Ready-Mix plant)

Lafarge Canada Inc, Winterburn Ready-Mix plant

278 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXGG25A5HFE (Lafarge Canada Inc, Regina plant)

Lafarge Canada Inc, Regina plant

237 kg CO2e/m³
Material Image

Ready-mix concrete, 50 MPa at 91 days; Cement type: Manufacturer specific, Mix RMXYP50B3A8M (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

201 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG30A6A8M (Lafarge Canada Inc, Surrey Ready-Mix plant)

Lafarge Canada Inc, Surrey Ready-Mix plant

156 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG20A3A8M (Lafarge Canada Inc, Surrey Ready-Mix plant)

Lafarge Canada Inc, Surrey Ready-Mix plant

124 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Industry average, Mix RMXQD35A61P (Lafarge Canada Inc, Airdrie Ready-Mix plant)

Lafarge Canada Inc, Airdrie Ready-Mix plant

417 kg CO2e/m³
Material Image

Ready-mix concrete, 50 MPa at 2 days; Cement type: Manufacturer specific, Mix RMXK850A51F (Lafarge Canada Inc, Regina plant)

Lafarge Canada Inc, Regina plant

438 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXSF25A51FM (Lafarge Canada Inc, Lafarge Dawson Rd plant)

Lafarge Canada Inc, Lafarge Dawson Rd plant

148 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXMG20P31FM (Lafarge Canada Inc, North Vancouver Ready-Mix plant)

Lafarge Canada Inc, North Vancouver Ready-Mix plant

156 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG35A3A8M (Lafarge Canada Inc, Port Mann Ready-Mix plant)

Lafarge Canada Inc, Port Mann Ready-Mix plant

167 kg CO2e/m³
Material Image

Ready-mix concrete, 50 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXK825A21F (Lafarge Canada Inc, Winterburn Ready-Mix plant)

Lafarge Canada Inc, Winterburn Ready-Mix plant

426 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG30A21F (Lafarge Canada Inc, Saskatoon plant)

Lafarge Canada Inc, Saskatoon plant

289 kg CO2e/m³
Material Image

Ready-mix concrete, 40 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXAGV4021 (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

245 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG35A3A8M (Lafarge Canada Inc, Chilliwack Ready-Mix plant)

Lafarge Canada Inc, Chilliwack Ready-Mix plant

170 kg CO2e/m³
Material Image

Ready-mix concrete, 40 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXGG40A5HF (Lafarge Canada Inc, Regina plant)

Lafarge Canada Inc, Regina plant

393 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXMG30P31FM (Lafarge Canada Inc, North Vancouver Ready-Mix plant)

Lafarge Canada Inc, North Vancouver Ready-Mix plant

181 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG25A51V (Lafarge Canada Inc, Clearbrook Ready-Mix plant)

Lafarge Canada Inc, Clearbrook Ready-Mix plant

188 kg CO2e/m³
Material Image

Ready-mix concrete, 40 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUV40A5A1 (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

290 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG32A61VP (Lafarge Canada Inc, Clearbrook Ready-Mix plant)

Lafarge Canada Inc, Clearbrook Ready-Mix plant

204 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG35A61F (Lafarge Canada Inc, Winterburn Ready-Mix plant)

Lafarge Canada Inc, Winterburn Ready-Mix plant

360 kg CO2e/m³
Material Image

Ready-mix concrete, 40 MPa at 28 days; Cement type: Industry average, Mix RMXGG40A21F (Lafarge Canada Inc, Northland Oak Bluff plant)

Lafarge Canada Inc, Northland Oak Bluff plant

325 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG25A21F (Lafarge Canada Inc, Nisku Ready-Mix plant)

Lafarge Canada Inc, Nisku Ready-Mix plant

295 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 56 days; Cement type: Industry average, Mix UN25A51FE (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

244 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXAGVCFA01 (Lafarge Canada Inc, Nisku Ready-Mix plant)

Lafarge Canada Inc, Nisku Ready-Mix plant

258 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Industry average, Mix RMXG825A21F (Lafarge Canada Inc, Spy Hill Ready-Mix plant)

Lafarge Canada Inc, Spy Hill Ready-Mix plant

227 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Industry average, Mix RMXWV25L21F (Lafarge Canada Inc, Perimeter Portage-la-Prairie plant)

Lafarge Canada Inc, Perimeter Portage-la-Prairie plant

251 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXMG25P31F (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

211 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Industry average, Mix RMXUH32A61U (Lafarge Canada Inc, Northland Oak Bluff plant)

Lafarge Canada Inc, Northland Oak Bluff plant

358 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXUH25A3A1 (Lafarge Canada Inc, Nisku Ready-Mix plant)

Lafarge Canada Inc, Nisku Ready-Mix plant

296 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Industry average, Mix RMX4L32A71P (Lafarge Canada Inc, Northland Oak Bluff plant)

Lafarge Canada Inc, Northland Oak Bluff plant

404 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXUD32A61U (Lafarge Canada Inc, Petroway Ready-Mix plant)

Lafarge Canada Inc, Petroway Ready-Mix plant

370 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 28 days; Cement type: Industry average, Mix RMXWV20A21FE (Lafarge Canada Inc, Perimeter Steinbach plant)

Lafarge Canada Inc, Perimeter Steinbach plant

231 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 56 days; Cement type: Industry average, Mix RMXHS32A57V (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

266 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Industry average, Mix RMXQD32A61W (Lafarge Canada Inc, Spy Hill Ready-Mix plant)

Lafarge Canada Inc, Spy Hill Ready-Mix plant

376 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXHS25A21F (Lafarge Canada Inc, Stadium road Ready-Mix plant)

Lafarge Canada Inc, Stadium road Ready-Mix plant

285 kg CO2e/m³
Material Image

Ready-mix concrete, 50 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUV50B2A1 (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

281 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Industry average, Mix RMXQD32A61W (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

375 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Industry average, Mix RMXWV25A21FE (Lafarge Canada Inc, Northland Oak Bluff plant)

Lafarge Canada Inc, Northland Oak Bluff plant

211 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 56 days; Cement type: Industry average, Mix RMXHS30A57V (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

261 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG32A61VP (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

209 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXSY35B61T (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

283 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Industry average, Mix RMXQD30A11S (Lafarge Canada Inc, Spy Hill Ready-Mix plant)

Lafarge Canada Inc, Spy Hill Ready-Mix plant

287 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 28 days; Cement type: Industry average, Mix RMXGG20A21F (Lafarge Canada Inc, Perimeter Portage-la-Prairie plant)

Lafarge Canada Inc, Perimeter Portage-la-Prairie plant

227 kg CO2e/m³
Material Image

Ready-mix concrete, 5 MPa at 28 days; Cement type: Industry average, Mix RMXJG05R51F (Lafarge Canada Inc, Spy Hill Ready-Mix plant)

Lafarge Canada Inc, Spy Hill Ready-Mix plant

176 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Industry average, Mix RMXG825A21F (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

232 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG30A3A8M (Lafarge Canada Inc, Vancouver Harbour Ready-Mix plant)

Lafarge Canada Inc, Vancouver Harbour Ready-Mix plant

145 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 28 days; Cement type: Industry average, Mix RMXWV20A21FE (Lafarge Canada Inc, Lafarge Dawson Rd plant)

Lafarge Canada Inc, Lafarge Dawson Rd plant

210 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Industry average, Mix RMXG832A61P (Lafarge Canada Inc, Spy Hill Ready-Mix plant)

Lafarge Canada Inc, Spy Hill Ready-Mix plant

338 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 56 days; Cement type: Industry average, Mix RMXG830A11FE (Lafarge Canada Inc, Spy Hill Ready-Mix plant)

Lafarge Canada Inc, Spy Hill Ready-Mix plant

233 kg CO2e/m³
Material Image

Ready-mix concrete, 40 MPa at 1 days; Cement type: Industry average, Mix RMXK645C21P (Lafarge Canada Inc, Perimeter Niverville plant)

Lafarge Canada Inc, Perimeter Niverville plant

590 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 28 days; Cement type: Industry average, Mix RMXG820A11F (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

194 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG30A11F (Lafarge Canada Inc, Regina plant)

Lafarge Canada Inc, Regina plant

288 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG20A31V (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

188 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG25A41VP (Lafarge Canada Inc, Clearbrook Ready-Mix plant)

Lafarge Canada Inc, Clearbrook Ready-Mix plant

158 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXGG35A6HF (Lafarge Canada Inc, Saskatoon plant)

Lafarge Canada Inc, Saskatoon plant

387 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG30A2F4 (Lafarge Canada Inc, Nisku Ready-Mix plant)

Lafarge Canada Inc, Nisku Ready-Mix plant

281 kg CO2e/m³
Material Image

Ready-mix concrete, 60 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXK825A61F (Lafarge Canada Inc, Petroway Ready-Mix plant)

Lafarge Canada Inc, Petroway Ready-Mix plant

459 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Industry average, Mix RMXG835A61F (Lafarge Canada Inc, Airdrie Ready-Mix plant)

Lafarge Canada Inc, Airdrie Ready-Mix plant

383 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXAGVCFA03 (Lafarge Canada Inc, Petroway Ready-Mix plant)

Lafarge Canada Inc, Petroway Ready-Mix plant

297 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG32A21F (Lafarge Canada Inc, Saskatoon plant)

Lafarge Canada Inc, Saskatoon plant

303 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 56 days; Cement type: Industry average, Mix RMXUG32A5SE (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

261 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG35A31VP (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

204 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG35B3A8M (Lafarge Canada Inc, North Vancouver Ready-Mix plant)

Lafarge Canada Inc, North Vancouver Ready-Mix plant

174 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Industry average, Mix RMXG830A11F (Lafarge Canada Inc, Spy Hill Ready-Mix plant)

Lafarge Canada Inc, Spy Hill Ready-Mix plant

225 kg CO2e/m³
Material Image

Ready-mix concrete, 40 MPa at 28 days; Cement type: Industry average, Mix RMXGG40A61F (Lafarge Canada Inc, Perimeter Niverville plant)

Lafarge Canada Inc, Perimeter Niverville plant

399 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG35A6A8M (Lafarge Canada Inc, Vancouver Harbour Ready-Mix plant)

Lafarge Canada Inc, Vancouver Harbour Ready-Mix plant

174 kg CO2e/m³
Material Image

Ready-mix concrete, 40 MPa at 1 days; Cement type: Industry average, Mix RMXK645C21P (Lafarge Canada Inc, Perimeter Steinbach plant)

Lafarge Canada Inc, Perimeter Steinbach plant

590 kg CO2e/m³
Material Image

Ready-mix concrete, 45 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXV745A71T (Lafarge Canada Inc, Petroway Ready-Mix plant)

Lafarge Canada Inc, Petroway Ready-Mix plant

453 kg CO2e/m³
Material Image

Ready-mix concrete, 40 MPa at 28 days; Cement type: Industry average, Mix RMXK840A21F (Lafarge Canada Inc, Airdrie Ready-Mix plant)

Lafarge Canada Inc, Airdrie Ready-Mix plant

346 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 1 days; Cement type: Industry average, Mix RMXK925A21F (Lafarge Canada Inc, Northland Oak Bluff plant)

Lafarge Canada Inc, Northland Oak Bluff plant

501 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Industry average, Mix RMXGF32A21F (Lafarge Canada Inc, Northland Oak Bluff plant)

Lafarge Canada Inc, Northland Oak Bluff plant

290 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXMG30P31FM (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

173 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXMG35R31F (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

306 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG25B3A8M (Lafarge Canada Inc, North Vancouver Ready-Mix plant)

Lafarge Canada Inc, North Vancouver Ready-Mix plant

140 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Industry average, Mix RMXGF35A21F (Lafarge Canada Inc, Northland Oak Bluff plant)

Lafarge Canada Inc, Northland Oak Bluff plant

322 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Industry average, Mix RMXQW32A61P (Lafarge Canada Inc, Spy Hill Ready-Mix plant)

Lafarge Canada Inc, Spy Hill Ready-Mix plant

420 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Industry average, Mix RMXG830A61FE (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

279 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG32B61V (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

249 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 28 days; Cement type: Industry average, Mix RMXUV20A51FE (Lafarge Canada Inc, Spy Hill Ready-Mix plant)

Lafarge Canada Inc, Spy Hill Ready-Mix plant

211 kg CO2e/m³
Material Image

Ready-mix concrete, 40 MPa at 28 days; Cement type: Industry average, Mix RMXUU40A61F (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

372 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Industry average, Mix RMXQD25A11P (Lafarge Canada Inc, Spy Hill Ready-Mix plant)

Lafarge Canada Inc, Spy Hill Ready-Mix plant

268 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXRD32A61F (Lafarge Canada Inc, Regina plant)

Lafarge Canada Inc, Regina plant

330 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG35A21F (Lafarge Canada Inc, Stadium road Ready-Mix plant)

Lafarge Canada Inc, Stadium road Ready-Mix plant

326 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG30A3A8M (Lafarge Canada Inc, Port Mann Ready-Mix plant)

Lafarge Canada Inc, Port Mann Ready-Mix plant

147 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Industry average, Mix RMXSF30A51F (Lafarge Canada Inc, Northland Oak Bluff plant)

Lafarge Canada Inc, Northland Oak Bluff plant

255 kg CO2e/m³
Material Image

Ready-mix concrete, 40 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXUV40A1A1 (Lafarge Canada Inc, Clearbrook Ready-Mix plant)

Lafarge Canada Inc, Clearbrook Ready-Mix plant

249 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG32A21F (Lafarge Canada Inc, Petroway Ready-Mix plant)

Lafarge Canada Inc, Petroway Ready-Mix plant

320 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG25A5F4 (Lafarge Canada Inc, Stadium road Ready-Mix plant)

Lafarge Canada Inc, Stadium road Ready-Mix plant

264 kg CO2e/m³
Material Image

Ready-mix concrete, 28 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG28B5A8M (Lafarge Canada Inc, Clearbrook Ready-Mix plant)

Lafarge Canada Inc, Clearbrook Ready-Mix plant

141 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 56 days; Cement type: Industry average, Mix RMXHS32A57VE (Lafarge Canada Inc, Airdrie Ready-Mix plant)

Lafarge Canada Inc, Airdrie Ready-Mix plant

298 kg CO2e/m³
Material Image

Ready-mix concrete, 40 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXAGV4061 (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

262 kg CO2e/m³
Material Image

Ready-mix concrete, 15 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXG815A51F (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

176 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG25A21F (Lafarge Canada Inc, Saskatoon plant)

Lafarge Canada Inc, Saskatoon plant

268 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Industry average, Mix RMXG825A51F (Lafarge Canada Inc, Airdrie Ready-Mix plant)

Lafarge Canada Inc, Airdrie Ready-Mix plant

274 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 28 days; Cement type: Industry average, Mix RMXQD20B11W (Lafarge Canada Inc, Spy Hill Ready-Mix plant)

Lafarge Canada Inc, Spy Hill Ready-Mix plant

269 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 28 days; Cement type: Industry average, Mix RMXGG20A61F (Lafarge Canada Inc, Perimeter Niverville plant)

Lafarge Canada Inc, Perimeter Niverville plant

226 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG30A61VP (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

196 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG30A21F (Lafarge Canada Inc, Nisku Ready-Mix plant)

Lafarge Canada Inc, Nisku Ready-Mix plant

310 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 28 days; Cement type: Industry average, Mix RMXGG20A61F (Lafarge Canada Inc, Perimeter Portage-la-Prairie plant)

Lafarge Canada Inc, Perimeter Portage-la-Prairie plant

234 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG25A3A8M (Lafarge Canada Inc, North Vancouver Ready-Mix plant)

Lafarge Canada Inc, North Vancouver Ready-Mix plant

133 kg CO2e/m³
Material Image

Ready-mix concrete, 50 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXK825A21F (Lafarge Canada Inc, Nisku Ready-Mix plant)

Lafarge Canada Inc, Nisku Ready-Mix plant

456 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG30A2F4 (Lafarge Canada Inc, Petroway Ready-Mix plant)

Lafarge Canada Inc, Petroway Ready-Mix plant

292 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG30A3A8M (Lafarge Canada Inc, Surrey Ready-Mix plant)

Lafarge Canada Inc, Surrey Ready-Mix plant

148 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG35B6A8M (Lafarge Canada Inc, Vancouver Harbour Ready-Mix plant)

Lafarge Canada Inc, Vancouver Harbour Ready-Mix plant

177 kg CO2e/m³
Material Image

Ready-mix concrete, 60 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXK830A61U (Lafarge Canada Inc, Petroway Ready-Mix plant)

Lafarge Canada Inc, Petroway Ready-Mix plant

468 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 56 days; Cement type: Industry average, Mix RMXAGA3561C (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

330 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG35B31VP (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

209 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 28 days; Cement type: Industry average, Mix RMXGG20A61F (Lafarge Canada Inc, Lafarge Dawson Rd plant)

Lafarge Canada Inc, Lafarge Dawson Rd plant

210 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG25A3A8M (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

130 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXMG25P31FM (Lafarge Canada Inc, Clearbrook Ready-Mix plant)

Lafarge Canada Inc, Clearbrook Ready-Mix plant

158 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Industry average, Mix RMXWH32A61VE (Lafarge Canada Inc, Perimeter Steinbach plant)

Lafarge Canada Inc, Perimeter Steinbach plant

343 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXMG30P31FM (Lafarge Canada Inc, Clearbrook Ready-Mix plant)

Lafarge Canada Inc, Clearbrook Ready-Mix plant

166 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 56 days; Cement type: Industry average, Mix RMXHS32A57VE (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

259 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG30A6A8M (Lafarge Canada Inc, Port Mann Ready-Mix plant)

Lafarge Canada Inc, Port Mann Ready-Mix plant

155 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG25B5A8M (Lafarge Canada Inc, Port Mann Ready-Mix plant)

Lafarge Canada Inc, Port Mann Ready-Mix plant

142 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG25A31V (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

186 kg CO2e/m³
Material Image

Ready-mix concrete, 90 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXAGV9021B (Lafarge Canada Inc, Nisku Ready-Mix plant)

Lafarge Canada Inc, Nisku Ready-Mix plant

443 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG35A61F (Lafarge Canada Inc, Petroway Ready-Mix plant)

Lafarge Canada Inc, Petroway Ready-Mix plant

394 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Industry average, Mix RMX4J32A71F (Lafarge Canada Inc, Lafarge Dawson Rd plant)

Lafarge Canada Inc, Lafarge Dawson Rd plant

348 kg CO2e/m³
Material Image

Ready-mix concrete, 60 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXK825A61F (Lafarge Canada Inc, Nisku Ready-Mix plant)

Lafarge Canada Inc, Nisku Ready-Mix plant

452 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG30A6A8M (Lafarge Canada Inc, North Vancouver Ready-Mix plant)

Lafarge Canada Inc, North Vancouver Ready-Mix plant

156 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG25B3A8M (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

135 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Industry average, Mix RMXSC32A61F (Lafarge Canada Inc, Perimeter Niverville plant)

Lafarge Canada Inc, Perimeter Niverville plant

353 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXVD30A71U (Lafarge Canada Inc, Petroway Ready-Mix plant)

Lafarge Canada Inc, Petroway Ready-Mix plant

377 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXHC32A61P (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

379 kg CO2e/m³
Material Image

Ready-mix concrete, 0 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXOY00C21F (Lafarge Canada Inc, Petroway Ready-Mix plant)

Lafarge Canada Inc, Petroway Ready-Mix plant

120 kg CO2e/m³
Material Image

Ready-mix concrete, 40 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUV40B1A1 (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

264 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG30A3A8M (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

145 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXAGV3521 (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

242 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 56 days; Cement type: Industry average, Mix RMXHS32A57VE (Lafarge Canada Inc, Spy Hill Ready-Mix plant)

Lafarge Canada Inc, Spy Hill Ready-Mix plant

267 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG30A5A8M (Lafarge Canada Inc, Vancouver Harbour Ready-Mix plant)

Lafarge Canada Inc, Vancouver Harbour Ready-Mix plant

149 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXUV25A3A1 (Lafarge Canada Inc, Regina plant)

Lafarge Canada Inc, Regina plant

227 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 56 days; Cement type: Industry average, Mix RMXUV25A51FE (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

244 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUE25K11Z (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

237 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXUH30A1F1 (Lafarge Canada Inc, Nisku Ready-Mix plant)

Lafarge Canada Inc, Nisku Ready-Mix plant

335 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXRG20A5HF (Lafarge Canada Inc, Saskatoon plant)

Lafarge Canada Inc, Saskatoon plant

219 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 28 days; Cement type: Industry average, Mix RMXG820A51F (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

194 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Industry average, Mix RMXG830A11F (Lafarge Canada Inc, Airdrie Ready-Mix plant)

Lafarge Canada Inc, Airdrie Ready-Mix plant

259 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 28 days; Cement type: Industry average, Mix RMXGG20A61F (Lafarge Canada Inc, Perimeter Steinbach plant)

Lafarge Canada Inc, Perimeter Steinbach plant

232 kg CO2e/m³
Material Image

Ready-mix concrete, 60 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXK830A61U (Lafarge Canada Inc, Stadium road Ready-Mix plant)

Lafarge Canada Inc, Stadium road Ready-Mix plant

462 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Industry average, Mix RMXGF35A21F (Lafarge Canada Inc, Perimeter Steinbach plant)

Lafarge Canada Inc, Perimeter Steinbach plant

344 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXQS35A11P (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

315 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 56 days; Cement type: Industry average, Mix RMXAGA3561C (Lafarge Canada Inc, Airdrie Ready-Mix plant)

Lafarge Canada Inc, Airdrie Ready-Mix plant

368 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG35B5A8M (Lafarge Canada Inc, Port Mann Ready-Mix plant)

Lafarge Canada Inc, Port Mann Ready-Mix plant

179 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG25B51VP (Lafarge Canada Inc, Clearbrook Ready-Mix plant)

Lafarge Canada Inc, Clearbrook Ready-Mix plant

168 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 1 days; Cement type: Industry average, Mix RMXEG45A71W (Lafarge Canada Inc, Perimeter Steinbach plant)

Lafarge Canada Inc, Perimeter Steinbach plant

512 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXMG25P31FM (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

165 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXG832A61FE (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

313 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 1 days; Cement type: Industry average, Mix RMXK925A21F (Lafarge Canada Inc, Perimeter Steinbach plant)

Lafarge Canada Inc, Perimeter Steinbach plant

525 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG35B5A8M (Lafarge Canada Inc, Surrey Ready-Mix plant)

Lafarge Canada Inc, Surrey Ready-Mix plant

180 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXAGVCFA01 (Lafarge Canada Inc, Winterburn Ready-Mix plant)

Lafarge Canada Inc, Winterburn Ready-Mix plant

230 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG20A21F (Lafarge Canada Inc, Saskatoon plant)

Lafarge Canada Inc, Saskatoon plant

270 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG25A11F (Lafarge Canada Inc, Regina plant)

Lafarge Canada Inc, Regina plant

237 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 3 days; Cement type: Industry average, Mix RMXUH32A71P (Lafarge Canada Inc, Perimeter Portage-la-Prairie plant)

Lafarge Canada Inc, Perimeter Portage-la-Prairie plant

432 kg CO2e/m³
Material Image

Ready-mix concrete, 90 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXAGV9021B (Lafarge Canada Inc, Stadium road Ready-Mix plant)

Lafarge Canada Inc, Stadium road Ready-Mix plant

443 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Industry average, Mix RMXGF25A21F (Lafarge Canada Inc, Lafarge Dawson Rd plant)

Lafarge Canada Inc, Lafarge Dawson Rd plant

264 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Industry average, Mix RMXGF25A21F (Lafarge Canada Inc, Perimeter Steinbach plant)

Lafarge Canada Inc, Perimeter Steinbach plant

286 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXMG20P31FM (Lafarge Canada Inc, Vancouver Harbour Ready-Mix plant)

Lafarge Canada Inc, Vancouver Harbour Ready-Mix plant

147 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 56 days; Cement type: Industry average, Mix RMXG835A11FE (Lafarge Canada Inc, Airdrie Ready-Mix plant)

Lafarge Canada Inc, Airdrie Ready-Mix plant

294 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 1 days; Cement type: Industry average, Mix RMXEG45A71W (Lafarge Canada Inc, Lafarge Dawson Rd plant)

Lafarge Canada Inc, Lafarge Dawson Rd plant

497 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG25A31V (Lafarge Canada Inc, Clearbrook Ready-Mix plant)

Lafarge Canada Inc, Clearbrook Ready-Mix plant

179 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG35A61F (Lafarge Canada Inc, Saskatoon plant)

Lafarge Canada Inc, Saskatoon plant

384 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXUH30A1F1 (Lafarge Canada Inc, Stadium road Ready-Mix plant)

Lafarge Canada Inc, Stadium road Ready-Mix plant

338 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG30A2F4 (Lafarge Canada Inc, Stadium road Ready-Mix plant)

Lafarge Canada Inc, Stadium road Ready-Mix plant

276 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXRW20A5HFE (Lafarge Canada Inc, Saskatoon plant)

Lafarge Canada Inc, Saskatoon plant

238 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG35A61P (Lafarge Canada Inc, Saskatoon plant)

Lafarge Canada Inc, Saskatoon plant

477 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXRW25A5HFE (Lafarge Canada Inc, Saskatoon plant)

Lafarge Canada Inc, Saskatoon plant

253 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXSS32A57FM (Lafarge Canada Inc, Lafarge Dawson Rd plant)

Lafarge Canada Inc, Lafarge Dawson Rd plant

158 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 56 days; Cement type: Industry average, Mix RMXG825A21FE (Lafarge Canada Inc, Airdrie Ready-Mix plant)

Lafarge Canada Inc, Airdrie Ready-Mix plant

255 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Industry average, Mix RMXGF32A21F (Lafarge Canada Inc, Lafarge Dawson Rd plant)

Lafarge Canada Inc, Lafarge Dawson Rd plant

288 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Industry average, Mix RMXG835A61F (Lafarge Canada Inc, Spy Hill Ready-Mix plant)

Lafarge Canada Inc, Spy Hill Ready-Mix plant

350 kg CO2e/m³
Material Image

Ready-mix concrete, 10 MPa at 28 days; Cement type: Industry average, Mix RMXLC08A61U (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

129 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 56 days; Cement type: Industry average, Mix RMXGX32A57FE (Lafarge Canada Inc, Perimeter Niverville plant)

Lafarge Canada Inc, Perimeter Niverville plant

285 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 56 days; Cement type: Industry average, Mix RMXGX32A57FE (Lafarge Canada Inc, Perimeter Portage-la-Prairie plant)

Lafarge Canada Inc, Perimeter Portage-la-Prairie plant

293 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 56 days; Cement type: Industry average, Mix RMXG825A21FE (Lafarge Canada Inc, Spy Hill Ready-Mix plant)

Lafarge Canada Inc, Spy Hill Ready-Mix plant

223 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Industry average, Mix RMXUH32A61U (Lafarge Canada Inc, Perimeter Niverville plant)

Lafarge Canada Inc, Perimeter Niverville plant

373 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG25A21F (Lafarge Canada Inc, Petroway Ready-Mix plant)

Lafarge Canada Inc, Petroway Ready-Mix plant

305 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG32A61F (Lafarge Canada Inc, Winterburn Ready-Mix plant)

Lafarge Canada Inc, Winterburn Ready-Mix plant

333 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 28 days; Cement type: Industry average, Mix RMXWV20A21FE (Lafarge Canada Inc, Perimeter Portage-la-Prairie plant)

Lafarge Canada Inc, Perimeter Portage-la-Prairie plant

235 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Industry average, Mix RMXSF25A51F (Lafarge Canada Inc, Perimeter Niverville plant)

Lafarge Canada Inc, Perimeter Niverville plant

273 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG32A61F (Lafarge Canada Inc, Petroway Ready-Mix plant)

Lafarge Canada Inc, Petroway Ready-Mix plant

368 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Industry average, Mix RMXWH32A61VE (Lafarge Canada Inc, Northland Oak Bluff plant)

Lafarge Canada Inc, Northland Oak Bluff plant

298 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG32A31V (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

229 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG25B51V (Lafarge Canada Inc, Clearbrook Ready-Mix plant)

Lafarge Canada Inc, Clearbrook Ready-Mix plant

193 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG35A3A8M (Lafarge Canada Inc, Vancouver Harbour Ready-Mix plant)

Lafarge Canada Inc, Vancouver Harbour Ready-Mix plant

164 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 28 days; Cement type: Industry average, Mix RMXUV20A51FE (Lafarge Canada Inc, Airdrie Ready-Mix plant)

Lafarge Canada Inc, Airdrie Ready-Mix plant

244 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 56 days; Cement type: Industry average, Mix RMXG825A21FE (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

228 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 28 days; Cement type: Industry average, Mix RMXG820A51F (Lafarge Canada Inc, Spy Hill Ready-Mix plant)

Lafarge Canada Inc, Spy Hill Ready-Mix plant

193 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Industry average, Mix RMXSC35A61F (Lafarge Canada Inc, Northland Oak Bluff plant)

Lafarge Canada Inc, Northland Oak Bluff plant

401 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG25B5A8M (Lafarge Canada Inc, Vancouver Harbour Ready-Mix plant)

Lafarge Canada Inc, Vancouver Harbour Ready-Mix plant

142 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Industry average, Mix RMXHC32A61P (Lafarge Canada Inc, Spy Hill Ready-Mix plant)

Lafarge Canada Inc, Spy Hill Ready-Mix plant

341 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Industry average, Mix RMXG835A11F (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

259 kg CO2e/m³
Material Image

Ready-mix concrete, 40 MPa at 28 days; Cement type: Industry average, Mix RMXGG40A61F (Lafarge Canada Inc, Perimeter Steinbach plant)

Lafarge Canada Inc, Perimeter Steinbach plant

407 kg CO2e/m³
Material Image

Ready-mix concrete, 24 MPa at 56 days; Cement type: Industry average, Mix RMXGX25A25FE (Lafarge Canada Inc, Perimeter Portage-la-Prairie plant)

Lafarge Canada Inc, Perimeter Portage-la-Prairie plant

265 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG30A3A8M (Lafarge Canada Inc, North Vancouver Ready-Mix plant)

Lafarge Canada Inc, North Vancouver Ready-Mix plant

147 kg CO2e/m³
Material Image

Ready-mix concrete, 24 MPa at 56 days; Cement type: Industry average, Mix RMXGX25A25FE (Lafarge Canada Inc, Perimeter Steinbach plant)

Lafarge Canada Inc, Perimeter Steinbach plant

262 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG25A5A8M (Lafarge Canada Inc, Vancouver Harbour Ready-Mix plant)

Lafarge Canada Inc, Vancouver Harbour Ready-Mix plant

135 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Industry average, Mix RMXWV25L21F (Lafarge Canada Inc, Northland Oak Bluff plant)

Lafarge Canada Inc, Northland Oak Bluff plant

213 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXUH20A21U (Lafarge Canada Inc, Stadium road Ready-Mix plant)

Lafarge Canada Inc, Stadium road Ready-Mix plant

287 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG25A5SF (Lafarge Canada Inc, Regina plant)

Lafarge Canada Inc, Regina plant

239 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG25A21F (Lafarge Canada Inc, Winterburn Ready-Mix plant)

Lafarge Canada Inc, Winterburn Ready-Mix plant

264 kg CO2e/m³
Material Image

Ready-mix concrete, 40 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUV40B5A1 (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

260 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Industry average, Mix RMXQD30A11S (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

292 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG25A41V (Lafarge Canada Inc, Clearbrook Ready-Mix plant)

Lafarge Canada Inc, Clearbrook Ready-Mix plant

181 kg CO2e/m³
Material Image

Ready-mix concrete, 55 MPa at 56 days; Cement type: Industry average, Mix RMXUU55B51F (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

376 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG25A2F4 (Lafarge Canada Inc, Nisku Ready-Mix plant)

Lafarge Canada Inc, Nisku Ready-Mix plant

246 kg CO2e/m³
Material Image

Ready-mix concrete, 40 MPa at 28 days; Cement type: Industry average, Mix RMXUU40A61F (Lafarge Canada Inc, Airdrie Ready-Mix plant)

Lafarge Canada Inc, Airdrie Ready-Mix plant

410 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXMG25P31FM (Lafarge Canada Inc, Maple Ridge Ready-Mix plant)

Lafarge Canada Inc, Maple Ridge Ready-Mix plant

165 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXRG35A61F (Lafarge Canada Inc, Regina plant)

Lafarge Canada Inc, Regina plant

291 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXAGVCFA03 (Lafarge Canada Inc, Stadium road Ready-Mix plant)

Lafarge Canada Inc, Stadium road Ready-Mix plant

290 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Industry average, Mix RMXSC32A61F (Lafarge Canada Inc, Northland Oak Bluff plant)

Lafarge Canada Inc, Northland Oak Bluff plant

338 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Industry average, Mix RMXGF30A21F (Lafarge Canada Inc, Perimeter Steinbach plant)

Lafarge Canada Inc, Perimeter Steinbach plant

302 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 28 days; Cement type: Industry average, Mix RMXQD20B11W (Lafarge Canada Inc, Airdrie Ready-Mix plant)

Lafarge Canada Inc, Airdrie Ready-Mix plant

301 kg CO2e/m³
Material Image

Ready-mix concrete, 40 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUV40A1A1 (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

260 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Industry average, Mix RMXUU35A11F (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

276 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXUH30A1F1 (Lafarge Canada Inc, Winterburn Ready-Mix plant)

Lafarge Canada Inc, Winterburn Ready-Mix plant

303 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 3 days; Cement type: Industry average, Mix RMXUH32A71P (Lafarge Canada Inc, Perimeter Steinbach plant)

Lafarge Canada Inc, Perimeter Steinbach plant

432 kg CO2e/m³
Material Image

Ready-mix concrete, 40 MPa at 28 days; Cement type: Industry average, Mix RMXUU40A11V (Lafarge Canada Inc, Spy Hill Ready-Mix plant)

Lafarge Canada Inc, Spy Hill Ready-Mix plant

287 kg CO2e/m³
Material Image

Ready-mix concrete, 0 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXOY00C21F (Lafarge Canada Inc, Winterburn Ready-Mix plant)

Lafarge Canada Inc, Winterburn Ready-Mix plant

93.2 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG30A61VP (Lafarge Canada Inc, Clearbrook Ready-Mix plant)

Lafarge Canada Inc, Clearbrook Ready-Mix plant

191 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXRW25A5HFE (Lafarge Canada Inc, Regina plant)

Lafarge Canada Inc, Regina plant

235 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXUH25A3A1 (Lafarge Canada Inc, Winterburn Ready-Mix plant)

Lafarge Canada Inc, Winterburn Ready-Mix plant

264 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXG830B51F (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

247 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Industry average, Mix RMXWH32A61VE (Lafarge Canada Inc, Perimeter Niverville plant)

Lafarge Canada Inc, Perimeter Niverville plant

336 kg CO2e/m³
Material Image

Ready-mix concrete, 60 MPa at 28 days; Cement type: Industry average, Mix RMXGG60A21F (Lafarge Canada Inc, Lafarge Dawson Rd plant)

Lafarge Canada Inc, Lafarge Dawson Rd plant

520 kg CO2e/m³
Material Image

Ready-mix concrete, 60 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXK825A61F (Lafarge Canada Inc, Winterburn Ready-Mix plant)

Lafarge Canada Inc, Winterburn Ready-Mix plant

426 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Industry average, Mix RMXGF32A21F (Lafarge Canada Inc, Perimeter Portage-la-Prairie plant)

Lafarge Canada Inc, Perimeter Portage-la-Prairie plant

314 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXIF30A11F (Lafarge Canada Inc, Saskatoon plant)

Lafarge Canada Inc, Saskatoon plant

320 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Industry average, Mix RMXSC35A61F (Lafarge Canada Inc, Lafarge Dawson Rd plant)

Lafarge Canada Inc, Lafarge Dawson Rd plant

401 kg CO2e/m³
Material Image

Ready-mix concrete, 45 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXMG45R31F (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

307 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Industry average, Mix RMXQD25A11P (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

273 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG20B31V (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

169 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG20A51F (Lafarge Canada Inc, Petroway Ready-Mix plant)

Lafarge Canada Inc, Petroway Ready-Mix plant

272 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXXD30C51F (Lafarge Canada Inc, Regina plant)

Lafarge Canada Inc, Regina plant

292 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Industry average, Mix RMXGF25A21F (Lafarge Canada Inc, Perimeter Portage-la-Prairie plant)

Lafarge Canada Inc, Perimeter Portage-la-Prairie plant

288 kg CO2e/m³
Material Image

Ready-mix concrete, 0 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXJG00R71F (Lafarge Canada Inc, Nisku Ready-Mix plant)

Lafarge Canada Inc, Nisku Ready-Mix plant

111 kg CO2e/m³
Material Image

Ready-mix concrete, 28 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG28B51VP (Lafarge Canada Inc, Clearbrook Ready-Mix plant)

Lafarge Canada Inc, Clearbrook Ready-Mix plant

180 kg CO2e/m³
Material Image

Ready-mix concrete, 5 MPa at 28 days; Cement type: Industry average, Mix RMXJG05R51F (Lafarge Canada Inc, Airdrie Ready-Mix plant)

Lafarge Canada Inc, Airdrie Ready-Mix plant

204 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXHS32A5A1 (Lafarge Canada Inc, Winterburn Ready-Mix plant)

Lafarge Canada Inc, Winterburn Ready-Mix plant

286 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Industry average, Mix RMXUH32A61U (Lafarge Canada Inc, Perimeter Portage-la-Prairie plant)

Lafarge Canada Inc, Perimeter Portage-la-Prairie plant

380 kg CO2e/m³
Material Image

Ready-mix concrete, 45 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXV745A71T (Lafarge Canada Inc, Winterburn Ready-Mix plant)

Lafarge Canada Inc, Winterburn Ready-Mix plant

417 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG20A21F (Lafarge Canada Inc, Nisku Ready-Mix plant)

Lafarge Canada Inc, Nisku Ready-Mix plant

264 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 1 days; Cement type: Industry average, Mix RMXEG45A71W (Lafarge Canada Inc, Northland Oak Bluff plant)

Lafarge Canada Inc, Northland Oak Bluff plant

503 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 1 days; Cement type: Industry average, Mix RMXK925A21F (Lafarge Canada Inc, Perimeter Niverville plant)

Lafarge Canada Inc, Perimeter Niverville plant

516 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Industry average, Mix RMXQD32A61W (Lafarge Canada Inc, Airdrie Ready-Mix plant)

Lafarge Canada Inc, Airdrie Ready-Mix plant

407 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Industry average, Mix RMXG825A51F (Lafarge Canada Inc, Spy Hill Ready-Mix plant)

Lafarge Canada Inc, Spy Hill Ready-Mix plant

242 kg CO2e/m³
Material Image

Ready-mix concrete, 40 MPa at 28 days; Cement type: Industry average, Mix RMXK840A21F (Lafarge Canada Inc, Spy Hill Ready-Mix plant)

Lafarge Canada Inc, Spy Hill Ready-Mix plant

314 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG25C61FE (Lafarge Canada Inc, Lafarge Dawson Rd plant)

Lafarge Canada Inc, Lafarge Dawson Rd plant

217 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXQD30A11P (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

257 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG35A5A8M (Lafarge Canada Inc, Vancouver Harbour Ready-Mix plant)

Lafarge Canada Inc, Vancouver Harbour Ready-Mix plant

172 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Industry average, Mix RMXWV25L21F (Lafarge Canada Inc, Perimeter Niverville plant)

Lafarge Canada Inc, Perimeter Niverville plant

242 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 3 days; Cement type: Industry average, Mix RMXEG32A71F (Lafarge Canada Inc, Northland Oak Bluff plant)

Lafarge Canada Inc, Northland Oak Bluff plant

410 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXMG20P31FM (Lafarge Canada Inc, Port Mann Ready-Mix plant)

Lafarge Canada Inc, Port Mann Ready-Mix plant

150 kg CO2e/m³
Material Image

Ready-mix concrete, 80 MPa at 56 days; Cement type: Industry average, Mix RMXUU80B1A4 (Lafarge Canada Inc, Spy Hill Ready-Mix plant)

Lafarge Canada Inc, Spy Hill Ready-Mix plant

391 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXRG20A5HFE (Lafarge Canada Inc, Saskatoon plant)

Lafarge Canada Inc, Saskatoon plant

484 kg CO2e/m³
Material Image

Ready-mix concrete, 0 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXOY00C21F (Lafarge Canada Inc, Nisku Ready-Mix plant)

Lafarge Canada Inc, Nisku Ready-Mix plant

112 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 28 days; Cement type: Industry average, Mix RMXGG20A21F (Lafarge Canada Inc, Lafarge Dawson Rd plant)

Lafarge Canada Inc, Lafarge Dawson Rd plant

202 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGF32A51FE (Lafarge Canada Inc, Saskatoon plant)

Lafarge Canada Inc, Saskatoon plant

297 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG35A61V (Lafarge Canada Inc, Clearbrook Ready-Mix plant)

Lafarge Canada Inc, Clearbrook Ready-Mix plant

243 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG32A61V (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

241 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG30A5A8M (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

149 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXG832A65P (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

313 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXAGVCFA03 (Lafarge Canada Inc, Winterburn Ready-Mix plant)

Lafarge Canada Inc, Winterburn Ready-Mix plant

260 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG35A21F (Lafarge Canada Inc, Petroway Ready-Mix plant)

Lafarge Canada Inc, Petroway Ready-Mix plant

334 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXMG20P31FM (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

151 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Industry average, Mix RMXSC32A61F (Lafarge Canada Inc, Perimeter Steinbach plant)

Lafarge Canada Inc, Perimeter Steinbach plant

360 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXRF20A4HF (Lafarge Canada Inc, Saskatoon plant)

Lafarge Canada Inc, Saskatoon plant

239 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG35B5A8M (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

177 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXHC32B61WF (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

382 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXAGVCFA01 (Lafarge Canada Inc, Stadium road Ready-Mix plant)

Lafarge Canada Inc, Stadium road Ready-Mix plant

261 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG25A31VP (Lafarge Canada Inc, Clearbrook Ready-Mix plant)

Lafarge Canada Inc, Clearbrook Ready-Mix plant

156 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG25A61F (Lafarge Canada Inc, Stadium road Ready-Mix plant)

Lafarge Canada Inc, Stadium road Ready-Mix plant

296 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXHS32A57F (Lafarge Canada Inc, Spy Hill Ready-Mix plant)

Lafarge Canada Inc, Spy Hill Ready-Mix plant

258 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Industry average, Mix RMXGF30A21F (Lafarge Canada Inc, Northland Oak Bluff plant)

Lafarge Canada Inc, Northland Oak Bluff plant

282 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXMG25P31FM (Lafarge Canada Inc, North Vancouver Ready-Mix plant)

Lafarge Canada Inc, North Vancouver Ready-Mix plant

173 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXRG35B11F (Lafarge Canada Inc, Regina plant)

Lafarge Canada Inc, Regina plant

309 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG35A5A8M (Lafarge Canada Inc, Surrey Ready-Mix plant)

Lafarge Canada Inc, Surrey Ready-Mix plant

176 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXMG25P31FM (Lafarge Canada Inc, Chilliwack Ready-Mix plant)

Lafarge Canada Inc, Chilliwack Ready-Mix plant

167 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Industry average, Mix RMXG830A61F (Lafarge Canada Inc, Airdrie Ready-Mix plant)

Lafarge Canada Inc, Airdrie Ready-Mix plant

309 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG25A2F4 (Lafarge Canada Inc, Stadium road Ready-Mix plant)

Lafarge Canada Inc, Stadium road Ready-Mix plant

249 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Industry average, Mix RMX4L32A71P (Lafarge Canada Inc, Perimeter Steinbach plant)

Lafarge Canada Inc, Perimeter Steinbach plant

411 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG25B3A8M (Lafarge Canada Inc, Port Mann Ready-Mix plant)

Lafarge Canada Inc, Port Mann Ready-Mix plant

137 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Industry average, Mix RMXUU35A61F (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

361 kg CO2e/m³
Material Image

Ready-mix concrete, 10 MPa at 28 days; Cement type: Industry average, Mix RMXLC08A61U (Lafarge Canada Inc, Spy Hill Ready-Mix plant)

Lafarge Canada Inc, Spy Hill Ready-Mix plant

130 kg CO2e/m³
Material Image

Ready-mix concrete, 50 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXAGA5021 (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

311 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG25A3A8M (Lafarge Canada Inc, Vancouver Harbour Ready-Mix plant)

Lafarge Canada Inc, Vancouver Harbour Ready-Mix plant

130 kg CO2e/m³
Material Image

Ready-mix concrete, 50 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXAGH5011 (Lafarge Canada Inc, Regina plant)

Lafarge Canada Inc, Regina plant

269 kg CO2e/m³
Material Image

Ready-mix concrete, 24 MPa at 56 days; Cement type: Industry average, Mix RMXGX25A25FE (Lafarge Canada Inc, Lafarge Dawson Rd plant)

Lafarge Canada Inc, Lafarge Dawson Rd plant

241 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Industry average, Mix RMXSF30A51FE (Lafarge Canada Inc, Lafarge Dawson Rd plant)

Lafarge Canada Inc, Lafarge Dawson Rd plant

254 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 3 days; Cement type: Industry average, Mix RMXEG32A71F (Lafarge Canada Inc, Perimeter Steinbach plant)

Lafarge Canada Inc, Perimeter Steinbach plant

418 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 56 days; Cement type: Industry average, Mix RMXGX32A57FE (Lafarge Canada Inc, Perimeter Steinbach plant)

Lafarge Canada Inc, Perimeter Steinbach plant

291 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG35A21F (Lafarge Canada Inc, Saskatoon plant)

Lafarge Canada Inc, Saskatoon plant

318 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Industry average, Mix RMXWV25A21FE (Lafarge Canada Inc, Perimeter Steinbach plant)

Lafarge Canada Inc, Perimeter Steinbach plant

243 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXG830B11F (Lafarge Canada Inc, Spy Hill Ready-Mix plant)

Lafarge Canada Inc, Spy Hill Ready-Mix plant

235 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Industry average, Mix RMXUV25C2A4E (Lafarge Canada Inc, Lafarge Dawson Rd plant)

Lafarge Canada Inc, Lafarge Dawson Rd plant

214 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Industry average, Mix RMXWH32A61V (Lafarge Canada Inc, Perimeter Portage-la-Prairie plant)

Lafarge Canada Inc, Perimeter Portage-la-Prairie plant

360 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 56 days; Cement type: Industry average, Mix RMXG830A11FE (Lafarge Canada Inc, Airdrie Ready-Mix plant)

Lafarge Canada Inc, Airdrie Ready-Mix plant

264 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXUH25A3A1 (Lafarge Canada Inc, Stadium road Ready-Mix plant)

Lafarge Canada Inc, Stadium road Ready-Mix plant

299 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXUH20A21U (Lafarge Canada Inc, Winterburn Ready-Mix plant)

Lafarge Canada Inc, Winterburn Ready-Mix plant

251 kg CO2e/m³
Material Image

Ready-mix concrete, 90 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXAGV9021B (Lafarge Canada Inc, Winterburn Ready-Mix plant)

Lafarge Canada Inc, Winterburn Ready-Mix plant

405 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXVD30A71U (Lafarge Canada Inc, Nisku Ready-Mix plant)

Lafarge Canada Inc, Nisku Ready-Mix plant

368 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Industry average, Mix RMXWV25L21F (Lafarge Canada Inc, Lafarge Dawson Rd plant)

Lafarge Canada Inc, Lafarge Dawson Rd plant

226 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 56 days; Cement type: Industry average, Mix RMXSS35A55FE (Lafarge Canada Inc, Perimeter Steinbach plant)

Lafarge Canada Inc, Perimeter Steinbach plant

425 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Industry average, Mix RMXG830A61FE (Lafarge Canada Inc, Spy Hill Ready-Mix plant)

Lafarge Canada Inc, Spy Hill Ready-Mix plant

278 kg CO2e/m³
Material Image

Ready-mix concrete, 24 MPa at 56 days; Cement type: Industry average, Mix RMXGX25A25FE (Lafarge Canada Inc, Perimeter Niverville plant)

Lafarge Canada Inc, Perimeter Niverville plant

257 kg CO2e/m³
Material Image

Ready-mix concrete, 1 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXJP01R51F (Lafarge Canada Inc, Regina plant)

Lafarge Canada Inc, Regina plant

123 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 56 days; Cement type: Industry average, Mix RMXHS30B57V (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

264 kg CO2e/m³
Material Image

Ready-mix concrete, 60 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXK830A61U (Lafarge Canada Inc, Winterburn Ready-Mix plant)

Lafarge Canada Inc, Winterburn Ready-Mix plant

428 kg CO2e/m³
Material Image

Ready-mix concrete, 40 MPa at 28 days; Cement type: Industry average, Mix RMXGG40A21F (Lafarge Canada Inc, Perimeter Steinbach plant)

Lafarge Canada Inc, Perimeter Steinbach plant

346 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Industry average, Mix RMXG830A61F (Lafarge Canada Inc, Spy Hill Ready-Mix plant)

Lafarge Canada Inc, Spy Hill Ready-Mix plant

283 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG35B6A8M (Lafarge Canada Inc, Surrey Ready-Mix plant)

Lafarge Canada Inc, Surrey Ready-Mix plant

181 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Industry average, Mix RMXWV25A21FE (Lafarge Canada Inc, Perimeter Portage-la-Prairie plant)

Lafarge Canada Inc, Perimeter Portage-la-Prairie plant

251 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXHS32A5A1 (Lafarge Canada Inc, Nisku Ready-Mix plant)

Lafarge Canada Inc, Nisku Ready-Mix plant

316 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXVE32A61F (Lafarge Canada Inc, Saskatoon plant)

Lafarge Canada Inc, Saskatoon plant

351 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG30A6A8M (Lafarge Canada Inc, Vancouver Harbour Ready-Mix plant)

Lafarge Canada Inc, Vancouver Harbour Ready-Mix plant

153 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 3 days; Cement type: Industry average, Mix RMXUH32A71P (Lafarge Canada Inc, Perimeter Niverville plant)

Lafarge Canada Inc, Perimeter Niverville plant

424 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Industry average, Mix RMXG825A21F (Lafarge Canada Inc, Airdrie Ready-Mix plant)

Lafarge Canada Inc, Airdrie Ready-Mix plant

260 kg CO2e/m³
Material Image

Ready-mix concrete, 5 MPa at 28 days; Cement type: Industry average, Mix RMXJG05R51F (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

172 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXSS32A57F (Lafarge Canada Inc, Lafarge Dawson Rd plant)

Lafarge Canada Inc, Lafarge Dawson Rd plant

292 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 28 days; Cement type: Industry average, Mix RMXGG20A21F (Lafarge Canada Inc, Northland Oak Bluff plant)

Lafarge Canada Inc, Northland Oak Bluff plant

204 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG35A5A8M (Lafarge Canada Inc, North Vancouver Ready-Mix plant)

Lafarge Canada Inc, North Vancouver Ready-Mix plant

175 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXG825B11F (Lafarge Canada Inc, Spy Hill Ready-Mix plant)

Lafarge Canada Inc, Spy Hill Ready-Mix plant

228 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG35B6A8M (Lafarge Canada Inc, North Vancouver Ready-Mix plant)

Lafarge Canada Inc, North Vancouver Ready-Mix plant

182 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 56 days; Cement type: Industry average, Mix RMXSS35A55FE (Lafarge Canada Inc, Perimeter Portage-la-Prairie plant)

Lafarge Canada Inc, Perimeter Portage-la-Prairie plant

424 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG25A51F (Lafarge Canada Inc, Regina plant)

Lafarge Canada Inc, Regina plant

270 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Industry average, Mix RMXGF25A21F (Lafarge Canada Inc, Northland Oak Bluff plant)

Lafarge Canada Inc, Northland Oak Bluff plant

265 kg CO2e/m³
Material Image

Ready-mix concrete, 5 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXUE05P3A4 (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

84.7 kg CO2e/m³
Material Image

Ready-mix concrete, 40 MPa at 28 days; Cement type: Industry average, Mix RMXGG40A21F (Lafarge Canada Inc, Perimeter Niverville plant)

Lafarge Canada Inc, Perimeter Niverville plant

340 kg CO2e/m³
Material Image

Ready-mix concrete, 40 MPa at 1 days; Cement type: Industry average, Mix RMXK645C21P (Lafarge Canada Inc, Lafarge Dawson Rd plant)

Lafarge Canada Inc, Lafarge Dawson Rd plant

572 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG25A5A8M (Lafarge Canada Inc, North Vancouver Ready-Mix plant)

Lafarge Canada Inc, North Vancouver Ready-Mix plant

138 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXMG25P31FM (Lafarge Canada Inc, Port Mann Ready-Mix plant)

Lafarge Canada Inc, Port Mann Ready-Mix plant

168 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Industry average, Mix RMXG835A61F (Lafarge Canada Inc, Calgary East Ready-Mix plant)

Lafarge Canada Inc, Calgary East Ready-Mix plant

348 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG32A61V (Lafarge Canada Inc, Clearbrook Ready-Mix plant)

Lafarge Canada Inc, Clearbrook Ready-Mix plant

236 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Industry average, Mix RMXQD35A61P (Lafarge Canada Inc, Spy Hill Ready-Mix plant)

Lafarge Canada Inc, Spy Hill Ready-Mix plant

385 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 56 days; Cement type: Industry average, Mix RMXSS35A55FE (Lafarge Canada Inc, Lafarge Dawson Rd plant)

Lafarge Canada Inc, Lafarge Dawson Rd plant

402 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Industry average, Mix RMXGF30A21F (Lafarge Canada Inc, Perimeter Niverville plant)

Lafarge Canada Inc, Perimeter Niverville plant

296 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 28 days; Cement type: Industry average, Mix RMXG820A11F (Lafarge Canada Inc, Spy Hill Ready-Mix plant)

Lafarge Canada Inc, Spy Hill Ready-Mix plant

190 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXRG35A11F (Lafarge Canada Inc, Regina plant)

Lafarge Canada Inc, Regina plant

306 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 1 days; Cement type: Industry average, Mix RMXEG45A71W (Lafarge Canada Inc, Perimeter Niverville plant)

Lafarge Canada Inc, Perimeter Niverville plant

513 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Industry average, Mix RMXGF35A21F (Lafarge Canada Inc, Perimeter Niverville plant)

Lafarge Canada Inc, Perimeter Niverville plant

337 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG20A31V (Lafarge Canada Inc, Clearbrook Ready-Mix plant)

Lafarge Canada Inc, Clearbrook Ready-Mix plant

186 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG32A21F (Lafarge Canada Inc, Stadium road Ready-Mix plant)

Lafarge Canada Inc, Stadium road Ready-Mix plant

313 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG35B5A8M (Lafarge Canada Inc, Vancouver Harbour Ready-Mix plant)

Lafarge Canada Inc, Vancouver Harbour Ready-Mix plant

176 kg CO2e/m³
Material Image

Ready-mix concrete, 40 MPa at 1 days; Cement type: Industry average, Mix RMXK645C21P (Lafarge Canada Inc, Perimeter Portage-la-Prairie plant)

Lafarge Canada Inc, Perimeter Portage-la-Prairie plant

605 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXMG30P31FM (Lafarge Canada Inc, Maple Ridge Ready-Mix plant)

Lafarge Canada Inc, Maple Ridge Ready-Mix plant

174 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG35A6A8M (Lafarge Canada Inc, Kent Avenue Ready-Mix plant)

Lafarge Canada Inc, Kent Avenue Ready-Mix plant

173 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG35A5F4E (Lafarge Canada Inc, Winterburn Ready-Mix plant)

Lafarge Canada Inc, Winterburn Ready-Mix plant

282 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Industry average, Mix RMXWH32A61V (Lafarge Canada Inc, Perimeter Niverville plant)

Lafarge Canada Inc, Perimeter Niverville plant

352 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Industry average, Mix RMXGF35A21F (Lafarge Canada Inc, Perimeter Portage-la-Prairie plant)

Lafarge Canada Inc, Perimeter Portage-la-Prairie plant

345 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG25A2F4 (Lafarge Canada Inc, Winterburn Ready-Mix plant)

Lafarge Canada Inc, Winterburn Ready-Mix plant

214 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG35A61F (Lafarge Canada Inc, Stadium road Ready-Mix plant)

Lafarge Canada Inc, Stadium road Ready-Mix plant

387 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG25B3A8M (Lafarge Canada Inc, Vancouver Harbour Ready-Mix plant)

Lafarge Canada Inc, Vancouver Harbour Ready-Mix plant

135 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXVD30A71U (Lafarge Canada Inc, Winterburn Ready-Mix plant)

Lafarge Canada Inc, Winterburn Ready-Mix plant

339 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXMG30P31FM (Lafarge Canada Inc, Port Mann Ready-Mix plant)

Lafarge Canada Inc, Port Mann Ready-Mix plant

175 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 28 days; Cement type: Industry average, Mix RMXQD25A51P (Lafarge Canada Inc, Spy Hill Ready-Mix plant)

Lafarge Canada Inc, Spy Hill Ready-Mix plant

272 kg CO2e/m³
Material Image

Ready-mix concrete, 30 MPa at 28 days; Cement type: Industry average, Mix RMXG830A61FE (Lafarge Canada Inc, Airdrie Ready-Mix plant)

Lafarge Canada Inc, Airdrie Ready-Mix plant

310 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Industry average, Mix RMXGF32A21F (Lafarge Canada Inc, Perimeter Steinbach plant)

Lafarge Canada Inc, Perimeter Steinbach plant

311 kg CO2e/m³
Material Image

Ready-mix concrete, 32 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXAGVCFA02 (Lafarge Canada Inc, Regina plant)

Lafarge Canada Inc, Regina plant

304 kg CO2e/m³
Material Image

Ready-mix concrete, 25 MPa at 56 days; Cement type: Manufacturer specific, Mix RMXUG25A5A8M (Lafarge Canada Inc, Port Mann Ready-Mix plant)

Lafarge Canada Inc, Port Mann Ready-Mix plant

137 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Industry average, Mix RMXSC35A61F (Lafarge Canada Inc, Perimeter Steinbach plant)

Lafarge Canada Inc, Perimeter Steinbach plant

424 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG20A21F (Lafarge Canada Inc, Stadium road Ready-Mix plant)

Lafarge Canada Inc, Stadium road Ready-Mix plant

267 kg CO2e/m³
Material Image

Ready-mix concrete, 40 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG40A11F (Lafarge Canada Inc, Regina plant)

Lafarge Canada Inc, Regina plant

365 kg CO2e/m³
Material Image

Ready-mix concrete, 20 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXUH20A21U (Lafarge Canada Inc, Nisku Ready-Mix plant)

Lafarge Canada Inc, Nisku Ready-Mix plant

283 kg CO2e/m³
Material Image

Ready-mix concrete, 35 MPa at 28 days; Cement type: Manufacturer specific, Mix RMXGG35A61F (Lafarge Canada Inc, Nisku Ready-Mix plant)

Lafarge Canada Inc, Nisku Ready-Mix plant

387 kg CO2e/m³